COC requirements
NC-2009 MRc7:Certified Woodposted by Farah A. on
Which of the following pieces of documentation are required to demonstrate compliance with MR Credit 7 Certified Wood?
Innovation in Design
NC-2009 IDc1:Innovation in Designposted by Farah A. on
A project team earns an Innovation in Design point for an innovative strategy on a previous project.
No process water use
Healthcare-v2009 WEp1:Water use reductionposted by yanghee pierce on
I am working on an outpatient clinic project that doesn’t have any equipment as listed in Table 2.
One RTU not qualifying the prescriptive requirements
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Sunayana Jain on
Hi, I am working on a LEED CI project in which HVAC equipments (serving tenant space) are not being replaced ( 5 RTU units), one of the RTU unit is very old and does not qualify Efficiency requirem
Ventilation Verification
CI-2009 IEQp1:Minimum IAQ Performanceposted by Laura Rebbe on
We have 4 questions listed below regarding IEQ Prerequisite 1 - Minimum Indoor Air Quality Performance. Question 1: Requirements, Case 1, Paragraph 3: We are seeking clarification or guidance conc
Battery Storage w/PVs...how does it impact points on EAc2, EAc1?
NC-2009 EAc2:On-Site Renewable Energyposted by Andrea Traber on
Electric battery storage is becoming cost effective in CA with our incentive programs and we are strongly considering it on a few projects, especially those with solar PV.
Recycled Content - Cut Sheet
CS-2009 MRc4:Recycled Contentposted by Carine Guenand on
Is an email from the supplier confirming post-consumer and pre-consumer recycled content of the material, sufficient as a cut sheet?
Toilet Light Shut-Off
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi, bathrooms can have a manual shutdown device for lighting? It is mandatory that all toilets automatically switch off the lighting? Thanks
Pedestrian Access
CI-2009 SSc2:Development Density and Community Connectivityposted by scott mccarthy on
I just got my Preliminary Design review comments...I successfully documented the 10 basic services and residential zone however did not show unobstructed pedestrian access connecting everything tog
Constant Volume RTUs and Energy Star Label
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Sunayana Jain on
I am not clear from CPG whether VAV is required for Option1 (Equipment Efficiency - 5 points). I have Constant Volume RTUs serving the tenant space. All of them have supply fan less than 5 HP.