Forum quick links
Regularly Occupied Spaces - Hotels
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Amanda Johnson on
Hello, I was wondering if the bathroom area of a hotel guestroom would be considered a regularly occupied space? Dito entry closet area... Thanks for any feedback on this,
Showers and changing rooms with toilettes?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by FABIO VIERO on
Hi, Showers and Changing Rooms of my project are located into the basement, dedicated to parking and circuation, with acess from outdoor. We have no space to provide toilettes close to changing r
Logical results?
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Maya Karkour on
Dear All, I just noticed what appears to be something illogical in C&S projects above 300,000sq.ft For the same number of building occupants, the larger the building area, the less the number
Natural ventilation of interior rooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Erika Duran on
We are working on a multifamily building with naturally ventilated interior kitchens located next to the living/dining rooms that have operable windows.
Window Ventilation in Multifamily Residential unit
NC-2009 EAp2:Minimum Energy Performanceposted by Erika Duran on
We received the following comment from USGBC: "...The project uses natural ventilation for some bedrooms in the Proposed design and exhaust fans to induce ventilation air into the dwelling units.
Door & Wall Protection
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Catherine Blakemore on
Does door and wall protection count as a wall finish? Does it need to be listed on the IEQc4, Group 2 - Wall & Ceiling Finishes Table on the IEQc4 Form and have to comply CDPH/EHLB Standard Me
DIRTT Millwork on a LEED project
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Valerie Molinski on
Anyone else use this on a project in lieu of tradional millwork fabricated by a local shop? The reason I ask is because we are in the final stages of trying to specify DIRTT millwork for a project
Pilot Credit 43... How many projects have attemped this credit?
Pilot-Credits PC43:Certified Productsposted by Jason Gasperich on
In looking at all of the different certifications available in the marketplace and trying to determine which of these are right for our company and products, I have begun to wonder if there are any
e-waste recycling event open to the public
EBOM-2009 MRc8:Solid Waste Management—Durable Goodsposted by Chris Miller on
If the building hosts an electronic waste recycling event that is open to the public, can the e-waste from that event count toward MRc8?
LEED Silver with EAp2 only?
CS-2009 EAc1:Optimize Energy Performanceposted by Matt Humphreys on
Is it possible for a project to achieve LEED Silver and only meet EAp2 by demonstrating 10% energy cost savings?