Walking path through another building
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Heather DeGrella on
Our project is on a University campus but is not using the campus approach. University students cut through other campus buildings frequently.
furnitures installed before the flush out
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Benjie Herrera on
Can furnitures be installed before the flush out?
VOC testing method
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Ralph Bicknese on
Does GBCI require a certain testing method for VOC compliance?
Path 2: Storm Water Quantity Control - Discharge into Estuary
CI-2009 SSc1:Site Selectionposted by Gail Williams on
Hello, We are working on a project in Ireland where the surface water runoff from the site flows directly into a tidal reach (estuary) without attenuation, as this has been confirmed to be the mo
question about a building at a major port
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Carrie Laurendine on
client has a office building (previously developed land) being built along a waterway at a major US port.
Glare Control - Glazing film
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Kristina Abrams on
Can a film be installed as a form of glare control for spaces with illuminance levels above 500fc?
Documenting Diversion Quantities
NC-2009 MRc2:Construction Waste Managementposted by Jennifer Kissinger on
We have an existing demolition project in which some of the concrete foundations/concrete slabs/block/brick debris can be taken to a recycling facility which will weigh each load, but some of the s
One 62MZCalc for each AHU?
CS-2009 IEQp1:Minimum IAQ Performanceposted by Aurelie Simon on
Dear all, We have a 10-storey office building located in Germany with 1 AHU for each floor. Each AHU serves different zones (office, storage, kitchen etc.).
Production area calculation
Pilot-Credits SSpc82:Local food productionposted by Danielle Ostafinski on
To demonstrate that at least one square foot per FTE is available for food production in a project with a greenhouse, should I use the square footage of the greenhouse space, or only the square foo
Having problems with IEQp1
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Ryan Gardner on
Our building is nearly 100% naturally ventilated. Every office space has more than enough window area to be compliant.