Parking split for different tenants
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Renaud Gay on
Hi everyone. We are assessing a distribution warehouse that will be leased to several tenants. Each tenants has a section of the building with its own parking. The total capacity meets the min.
Faucet Aerator Inserts
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Charlotte Page on
Does anyone know if the inserts to reduce flow in faucets is recognized by the USGBC?
CW leaving Temperature reset
CS-2009 EAp2:Minimum Energy Performanceposted by Dee Yun on
Hi, I am not sure about how to reset the CW leaving temperature in Baseline Case.
Working on an Island - NO MECHANISM TO RECYCLE MERCURY LAMPS
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Nate Gillette on
Hello, I am working with a resort on an island that currently does not have the capability to recycle mercury lamps.
Extra Lighting Allowance for Tenanted Areas
CS-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear All, I am modeling a retail C&S shopping mall, whereby the developer wants to give a lighting power allowance provision of 50 W/m2 for the retails shops.
Sealant for granite/marble
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Michael E. Edmonds-Bauer on
In a project we are working on they will speficy granite floors and a sealant will be needed to be applied to it. Would architectural sealant be the best fit for this? What falls into the categor
Low Emitting Materials - French Legislation Class A+
Retail-NC-v4 EQc2:Low emitting materialsposted by Ian McCall on
Hello all LEED V4 ers, LEED / USGBC have now accept International VOC / TVOC standards. LEED accepts the French class A+ formaldehyde limit value of 10 μg/m³ done at 28 days.
Query on grates/grilles in factory building for LEED NC Project
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by JP Rout on
We are working on a factory project for LEED NC Certification. Our query is specific to IEQ CR 5.0 for grates/grilles in all high traffic exterior entryways.
Energy Modeling
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Charles Nepps on
We received a review comment back, on Energy Modeling report use to document EA cr1.3, that stated the following: "The Proposed design air cooled chiller COP for office is indicated 2.5 does not c
Lighting Power Density-Multiple Bldg Types within one building
NC-2009 EAp2:Minimum Energy Performanceposted by Rebekah Burke on
Our Multipurpose Building is a new NCAA Division II, national broadcast basketball, academic, and exercise center for the campus.