ID Credit for Herbs Garden

NC-2009 IDc1:Innovation in Design
posted by  MOHD HAFIZI MOHAMAD  on 

Hi All. Currently, we have more than 10 percent of herbs garden from our total landscape area. Can we scoring one point for ID? Thanks

2
Technical Director, LEED
USGBC
LEEDuser Expert
225 thumbs up
Tue Sep 23, 2014, 3:54 pm

Water-Jet Marble Flooring

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Omar Elrawy  on 

Dear all, I have a custom shaped (curved) marble flooring, the marble is mineral based, but the supplier will be cutting the marble shapes at his factory, and will be adhering curved p

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Sep 23, 2014, 12:55 pm

Hi, We are working on a

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Neetika Parmar  on 

Hi, We are working on a refinery located in a remote/restricted area and hence there is no public bus access within 1/4 mile of the project.

2
Sr Project Manager / Operations Manager
Progressive AE
LEEDuser Basic Member
25 thumbs up
Tue Sep 23, 2014, 12:43 pm

Hi !
Are 10 basic services

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Neetika Parmar  on 

Hi ! Are 10 basic services limited to only those mentioned in LEED NC 2009 or can we include other services to target credit for community connectivity ??

2
Tue Sep 23, 2014, 12:41 pm

ASHRAE definition of "kitchenette"

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Ritwik Kakati  on 

Does anyone know how ASHRAE defines a "kitchenette" from a regular kitchen? I am trying to determine which value I should use from Table 6-4 of 62.1-2007.

7
Mon Sep 22, 2014, 7:33 pm

LEED-CS potential ID credits

CS-2009 IDc1:Innovation in Design
posted by  Angela Mai  on 

I have a commercial client who is the owner of a new-construction, multi-tenant building entering the final review phase of LEED-CS. I have a few questions about potential ID credits: 1.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Sep 22, 2014, 6:37 pm

Service Bay Entries

Pilot-Credits PC14:Walkable Streets
posted by  Anthony Bandy-Zalatoris  on 

The architect of our project created a design where there is no "back" of the building - the street-side elevation is nearly identical to the rear (parking lot and service side).

2
Manager, LEED Technical Development
U.S. Green Building Council
LEEDuser Premium Member
123 thumbs up
Sun Sep 21, 2014, 9:13 pm

Recycling Facility Letters of Certification

NC-2009 MRc2:Construction Waste Management
posted by  John Covello  on 

I have a question about doing an overseas project. Do we need some kind of Letters of Certification for the recycling facilities we are using?

5
Default Avatar
Senior Sustainability Manager
UL Solutions
LEEDuser Premium Member
7 thumbs up
Sun Sep 21, 2014, 8:48 pm

Pre-existing Campus PV Array - Does commissioning apply?

NC-2009 EAc2:On-Site Renewable Energy
posted by  Heather DeGrella  on 

If we are allocating production from a campus PV array, in which the array is already built and outside of our LEED boundary, how do commissioning requirements apply?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 19, 2014, 10:04 pm

stormwater when site is directly on the river?

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Carrie Laurendine  on 

site is on the river. I assume this doesn't change anything, but civil engineer asked I check to see if LEED has exceptions for this.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri Sep 19, 2014, 1:48 pm