Forum quick links
SSc10 Option 2
Schools-2009 SSc10:Joint Use of Facilitiesposted by Jim Cook on
We have a school project where the district has contracts for use of spaces in the building by outside community organizations.
Wall Tile
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Diana Studer on
I am working on a project in Canada that came back with first review commenting on the VOC content of the tile used.
Pilot Credit 88: LEED O+M Starter Kit
NC-v4 INc1:Innovationposted by Charalampos Giannikopoulos on
In LEED v4 NC, the pilot credit “IPpc88 - LEED O+M Starter Kit” is available to implement for up to 4 points.
EV Charging Stations
CI-2009 IDc1:Innovation in Designposted by Dominique Arrieta on
We have a CI project on a University Campus in which we are trying to get an ID point for the use of charging stations located in nearby parknig structures (various places nearby) to the project ar
Non english version
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Belén Valladares López on
Hi, I'm working in a C&S project located in Madrid. As tenants should be spanish Do I have to translate the whole document?.
50% of the "building's" electricity -- for Retail??
Retail-CI-v2009 EAc4:Green powerposted by Erica Downs on
Our CI-Retail project accounts for only about 12% of the overall building.
Whole Building Option C vs Option D
CI-2009 EAc3:Measurement and Verificationposted by Dan Forino on
We have a CI project which is in theory occupying 100% of a completely new non LEED, Core & Shell building.
DHW (Domestic Hot Water) as process load
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
It the project I'm modeling for LEED, the DHW is provided by several electric water heaters located in the the restroom zones. The modeling software is considering this as a stand alone base utilit
Electrostatic paint and VOC limits
CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Kim Sosalla-Bahr on
Has anyone had experience using electrostatic paint for on-site application, that complies with LEED VOC limits? Should this paint be considered a spray paint or a paint for metal surfaces?
Mold Testing Standards
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Susan Walter on
We have a project and the owner wants to include testing for mold. We had flooding in a project and two AHUs now show signs of mold.