Lease Agreement an option to comply with the credit requirements

CS-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Katherine Ann Resurreccion  on 

Hi, We are currently documenting the requirements for this credit and our option in order to comply is to provide a Tenant/Lease Agreement.

3
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu May 21, 2015, 5:18 pm

Process loads

NC-v4 EAc2:Optimize energy performance
posted by  Ake Larsson  on 

In our company, we have introduced LEED as mandatory for all new construction projects.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 20, 2015, 9:45 pm

How long do you have to do surveys?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Parker williams  on 

How long do you have to do surveys? Is this suppose to be ongoing forever?

4
Default Avatar
Energy Engineer
7group
LEEDuser Basic Member
18 thumbs up
Wed May 20, 2015, 9:45 pm

EAp2-4: Energy Star equipment: conversion from kWa to Watts

CI-2009 EAp2:Minimum Energy Performance
posted by  Sarah Simchuk  on 

I'm attempting to register the energy star equipment for my project under Table EAp2-4. The table asks for Rated Power in WATTS.

4
Wed May 20, 2015, 6:14 pm

Rated power

CI-2009 EAp2:Minimum Energy Performance
posted by  Yaser Al Sharif  on 

From where can i take rated power for equipments like laptop , i read it on laptop about 55wh then i divded it by work hours give me 6.7watt , is that right ??????

4
Wed May 20, 2015, 4:51 pm

M&V approach case 2 (75% or more of total building area)

CI-2009 EAc3:Measurement and Verification
posted by  Gaston Michaud  on 

We were trying to pursue this credit by developing and implementing a M&V plan following option C from the IPMVP, but after reading some comments, it seems that this path was removed.

3
Wed May 20, 2015, 4:47 pm

Clarification

CI-2009 EAc3:Measurement and Verification
posted by  Redy Truccolo  on 

Hi Marcus, We've a LEED CS certified building in which the Tenant will occupy almost 100% of the total area, so we will fall in CASE 2. We obtained the CS certification EAc5.2 credit and we've sub

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue May 19, 2015, 8:11 pm

Where to find the Ecologo-certified products?

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Helen Samuel  on 

Now that Ecologo was acquired by UL, where can I find which products are Ecologo-certified?

2
President
Design Management Services
LEEDuser Premium Member
25 thumbs up
Tue May 19, 2015, 1:35 pm

Molok Containers for MRp1

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Kristopher Lashley  on 

We are looking to install a 5000L Molok recycling bin for a LEED 2009 CS building that will be a restaurant. According to the reference guide a 11.6m recycling area would be required.

2
Mon May 18, 2015, 8:12 pm

EV Ready acceptable?

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Dylan Connelly  on 

For Core & Shell projects - is installing 3% of the parking stalls to be EV ready acceptable to achieve these points?

2
Chief Sustainability Officer
Integral Group
LEEDuser Basic Member
11 thumbs up
Mon May 18, 2015, 8:00 pm