Forum quick links
Project self shading for separate certifications
NC-2009 EAp2:Minimum Energy Performanceposted by Cory Duggin on
We have a project that is one large structure comprised of a rail station that acts as a platform on top of which two towers sit.
If using Option 4
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Courtney Royal on
Do you still need to provide preferred parking for carpools and vanpools? The flow chart listed above seems to suggest you do not. Thanks!
Data Center Baseline HVAC System with Ancillary Office Spaces
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Rajesh Balachander on
Hi Marcus Your comments and Suggestions were valuable for my understanding on doing my LEED EM for Data Center. I would like to confirm on my understanding.
Chemical Anchorage Pins
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Amanda Johnson on
Hi are Chemical Anchorage Pins for structural concrete walls included in the scope of this credit? I am guessing not but want to check....
Existing Building Renovation and Site Work
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Catherine Adams on
We have an existing two-story community recreation center with an adjacent parking lot. Most(about 75%) of the building interior will be renovated, with some new windows added to the perimeter.
Sensor activated lav faucets
CI-2009 WEc1:Water Use Reductionposted by Crista Shopis on
The Water Use Reduction Additional Guidance document states that "When using an autocontrol faucet with metering control or automatic fixture sensor, please select the Metering Lavatory fixture in
Fans broken out at ARI-rated conditions
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Dear all, I've got the following reply during my preliminary design submittal stage: "Note that section G3.1.2.1 requires that where efficiency ratings, such as EER and COP, include fa
Brownfield site but graded before the construction started
NC-2009 SSc3:Brownfield Redevelopmentposted by Michael Wahjudi on
Our site is brownfield (existing navy base), but the site is being graded before 1980 to be prepared as industrial area. The current construction activity start at 2014.
Streetside landscaped but not trees
Pilot-Credits PC14:Walkable Streetsposted by Trinidee Shelton on
We are wrapping up design for a project that is a Nature Center and are specifying native grasses along the street edge.
VOC Budget - Documentation
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Deborah Ebersole on
I am documenting the paints and coatings credit and I have one non-compliant paint that I need to offset. I want to do it with a single offset and I know that is allowable.