Forum quick links
Professional Engineer
EBOM-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
To comply with the prerequisite is it essential to engage a Professional Engineer if the project is located outside the U.S. and consequently ineligible for Energy Star certification?
Cooling only space and system type 2
NC-2009 EAp2:Minimum energy performanceposted by Laura Brandt on
I have a dormitory project which has a few cooling only spaces.
EAp2/EAc1, 1 pt denied, therefore, incorrect kWh - what to do?
NC-2009 EAc6:Green powerposted by Peg Manuel on
Using Option 1.
Double the Pleasure???
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Molly Jones on
So...if we participate in this pilot credit (option 1) AND we already comply with LEED-NC 2009 WEc2, is it safe to assume that we will be awarded 2 points under the LEED-NC 2009 WEc2 AND 1 ID point
FTE in a healthcare outpatient facility
NC-2009 PIf3:Occupant and Usage Dataposted by Elise LaPaglia on
I am working on a LEED-NC project that is primarily an outpatient facility but has some future shell spaces for Retail and some for future expansion of the outpatient facilities.
Pilot credits
EBOM-v4 INc1:Innovationposted by Charalampos Giannikopoulos on
Is there any particular reason for which a Pilot credit from the general EBOM rating system such as the "Design for active occupants" credit would not be accepted for LEED v4 O+M - Data Centers?
EnergyPro for Whole Building Energy Simulation
NC-2009 EAp2:Minimum energy performanceposted by Logan Dorrell on
We have a project in which they are attempting to use EnergyPro to show compliance for credits EAp2 and EAc1.
Can FSC Product Certification replace invoices?
CI-2009 MRc7:Certified woodposted by Mauricio Ramirez on
Hello. I'm pursuing this credit on a project in Mexico City.
To what extent we provide Tenant fitout
CS-2009 IEQc8.1:Daylight and views - daylightposted by Indochine Engineering VN on
Hi, my project has 19 office floors, and one floor is already fitted out by tenant. So the rest 18 floors are empty - open office.
How to document a non-LEED-certifiable building?
NC-2009 EAp2:Minimum energy performanceposted by Anya Fiechtl on
Our project includes a separate non-LEED certifiable building with no regularly occupied space and no FTE, that houses the renewable energy and ground source heat pump systems for the main building