Forum quick links
Case 2, Option 2 clarification - years
EBOM-v4 EAp2:Minimum energy performanceposted by Alexa Stone on
The reference guide refers to comparing site energy data for the previous 12 months with data from the 3 contiguous yrs of previous 5 yrs (in order to demo 25% improvement).
Kitchen MUA Unit
NC-2009 IEQp1:Minimum IAQ Performanceposted by Laura Charlier on
I'm wondering if the kitchen MUA unit needs to included in the ventilation calculations?
CO2 SENSOR IN AN UNDERGROUND METRO STATION.
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by VEL MUTHU on
Hello everyone, I am working in a underground metro station which is aiming for LEED certification.
Interior Lighting power
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Hi Markus and colleagues, If in the Proposed building the total interior lighting power (space by space method) is bigger than those of the Baseline, is this acceptable.
Post construction HVAC modifications
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Paula Hernandez on
Hi, We have a building in the construction review response instance. We are responding every comment, but we want to get more points to achieve Silver Certification.
Rounding of Percent Energy Cost Savings for EAc1 Points
NC-2009 EAc1:Optimize Energy Performanceposted by Joseph Chappell on
Hi all, We recently received a final design review where our percent energy cost savings have been corrected by the reviewer to show 31.95%.
Submetering - Core & Shell 2009
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Mohammad Haj-Ali on
We're designing an office building that the owner wants to provide flexibility in leasing, such that tenants can rent certain spaces in the floor, whole floors, or the whole building.
Parking Capacity includes capacity for Future Development
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Sadie Martin on
We are working on a project that is trying to jumpstart development in the city center.
100% Outside Air systems
CI-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Christie Rimes on
The base building HVAC system uses 100% outside air. Therefore there are no return grilles. I am assuming that the requirement for filtration then is not applicable?
Clarification for Btu units
NC-2009 EAp2:Minimum Energy Performanceposted by MURAT DOĞRU on
Dear all, Does anybody know whether the MBTU in DES Guidance v2.0 page 14 equals kBtu or MMBtu? It is generally used to express 1000 Btu's, however in some sources it is stated that it equals 1 mi