Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Furniture reuse

CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materials
posted by  Marie Miller  on 

Hello - I'm working on a TI project and the client is reusing over half their furniture. I know I include this in the calculator, but do I use the value of the furniture when it was purchased?

1
Thu Apr 27, 2023, 1:49 pm

Space Definition for IAQ Calculations

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Paula Hernandez  on 

Hi,

We are working on a C&S project. We know that the spaces on the Ground Floor will be Restaurants and Sales spaces.

3
Tue Apr 25, 2023, 4:05 pm

Adjustable luminaries tilt - Option 1 (BUG) Vs Option 2 (Calculation)

NC-v4 SSc6:Light pollution reduction
posted by  Anna Korinkova  on 

Hi, 

I would like to clarify how to characterize adjustable luminaires. 

9
Tue Apr 25, 2023, 6:27 am

Pilot Credit: Procurement of Low Carbon Construction Materials (Cemco Sure-Board)

NC-v4 INc1:Innovation
posted by  Dejana Harris  on 

A project pursuing MRpc123 Procurement of Low Carbon Construction Materials is using Cemco Sure-Board, which is a prefabricated fiber cement panel and steel assembly.

1
Mon May 22, 2023, 12:48 am

Water Restoration Certificates (WRC) Provider

Pilot-Credits WEpc110:Water Restoration Certificates®
posted by  Jason Biondi  on 

Besides Bonneville Environmental Foundation (BEF), are there any other provider(s) for Water Restoration Certificates® ?

0

Do non-contiguous habitat areas qualify?

NC-v4.1 SSc2:Protect or Restore Habitat
posted by  Jennifer Rennick  on 

We are working on a 4-acre site with multiple buildings that aims to landscape with natives as much as possible.

0

Lights mounted under a photovoltaic canopy

CS-v4 SSc6:Light pollution reduction
posted by  Samuel Calhoun  on 

Hi. A project I am assessing has a photovoltaic canopy that covers roof parking. Do the lights under this canopy need to be included in the BUG assessment?

0

INpc142 Safety First Pilot Credit Arc Re-Entry

EBOM-v4.1 INc1:Innovation
posted by  Barry Abramson  on 

Although Arc Re-Entry has perhaps passed it's useful life for the COVID-19 pandemic, it was a well-designed tool to manage the re-entry process, which we used for several clients and documented for

0