Forum quick links
Solar powered parking lot lights
NC-v4 EAc5:Renewable energy productionposted by Jason Garvens on
Would dedicated solar powered parking lot lights help contribute toward obtaining x% of the buildings annual energy cost covered by renewable energy?
Parking Garage & exterior Site Lighting part of building Energy Model?
NC-2009 EAp2:Minimum Energy Performanceposted by Adrian Arenas on
We Have two building pursuing LEED v2009 NC, both building share an underground parking garage.
INDIA ACP Interior lighting
NC-v4 EQc6:Interior lightingposted by Lalitya Reddy on
Hello LEEDusers,
I am looking for guidance on Interior Lighting credit in LEED v4 and v4.1
Direction for testing new and retrofitted equipment
CI-v4 EAc1:Enhanced commissioningposted by Francesco Passerini on
Dear all,
Among the content that is request for the Ongoing Cx plan the following one is specified by the ID+C Reference guide: “Direction for testing new and retrofitted equipment”.
Sheet membrane for waterproofing/crack isolation
NC-v4.1 EQc2:Low-Emitting Materialsposted by Allen Cornett on
Is sheet membrane waterproofing/crack isolation considered an underlayment that needs to be documented in the Low-Emitting Materials Flooring category? I have used troweled products that are
LEEDonline: uploading documents in master site
NC-v4 LTc6:Bicycle facilitiesposted by N. Josef Nassif on
Accroding to Guide Campus approach, it states the following:
Food and beberage tenant lease agreement
CS-v4 EQp1:Minimum indoor air quality performanceposted by Julio Fernandez Amodia on
Hi to all,
Vegetated buffer space qualifying as accessible space?
NC-v4 SSc3:Open spaceposted by Chris Flint Chatto on
How much of vegetation on either side of path can count as qualifying open space? it is clear from the credit that on site with a path through a garden, the entirety of the garden could quali
Social Equity within the Project Team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Jonathan Weiss on
Our project is using this pilot credit but the pathway about the project owner - who has done the hard work within their own JEDI process - has anyone successfully used that methodology to galvaniz
LEED 2009 Core and Shell - Kitchen equipments modelling
CS-2009 EAp2:Minimum Energy Performanceposted by Jerzy Wójcik on
Dear Marcus I am writting to enquire about kitchen plugloads in CS. In one of our CS project client wants to include restaurant and kitchen.