NC-2009 IDc1:Innovation in Designposted by William Brown on
We received feedback from GBCI that our Green Cleaning Policy lacks "Standard cleaning procedures to protect vulnerable building occupants.
Fire Station water calculations
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Heather Appell on
I am currently working on a Fire Station that has a total of 18 employees. However, each shift is 24 hours long and it's 6 employees per shift.
Operable windows & mechanically ventilated space
NC-2009 IEQp1:Minimum IAQ Performanceposted by Charalampos Giannikopoulos on
For a mechanically ventilated building for which the project team has attempted compliance with IEQc6.2 with operable windows the reviewer has commented at IEQp1 that the project may demonstrate co
Form
NC-2009 EAc2:On-Site Renewable Energyposted by GISELA FARHAT DE ARAUJO on
The EAC2 Form asks for "Annual Renewable Energy Cost". You said in a post that is "It is the avoided energy cost associated with the renewables at the virtual rate from the Proposed model.
Eac2 form
NC-2009 EAc2:On-Site Renewable Energyposted by GISELA FARHAT DE ARAUJO on
Hi. I have a 34,2 Kw solar system that generate 49.425 kWh/year. I need help to fill the form: 1- In table: Renewable energy - what information should I put in the item "Annual Energy Cost"?
Interpretation Problem
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Maria Isabel Conde on
We have a problem with the interpretation of the information necessary to apply for this credit.
Shared solar array on a campus with separate utility feeds
NC-2009 EAc2:On-Site Renewable Energyposted by Rebecca Bryant on
We are working on a hospitality project that is attempting LEED Gold, and is part of a larger campus.
Certifying a light rail station
NC-v4 MPR3:Must comply with project size requirementsposted by Elizabeth Powers on
I am exploring the point at which a light rail station becomes eligible for LEED certification under LEEDv4. It was slightly clearer in the MPRs for 2009, but not entirely.
Exterior Lighting – Table 1.4.3B
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
The last section of Table 1.4.3B asks for (i) the “Total Exterior Lighting Power Calculated Above (Watts)” and (ii) the “Total Exterior Lighting Power Modeled (Watts)”.
ASHRAE 90.1 Table 6.5.3.1.1A VS Table G3.1.2.9
NC-2009 EAc1:Optimize Energy Performanceposted by Ameet AA on
Hello, I'm confused with the two tables.