Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Performance Period and this credit

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Sara Zoumbaris  on 

Hello All, My questions touches on how this credit, in the LEED Online form, only asks for an audit date and not a performance period start and end date.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Jul 21, 2016, 8:33 pm

Measuring walking distance in L-shaped vestibule

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Lyle Axelarris  on 

The vestibule is actually rectangular, but the exterior door is 90 degrees off of the interior door, so the walking path is not straight.

5
Building Enclosure Consultant
BPL Enclosure
LEEDuser Basic Member
58 thumbs up
Thu Jul 21, 2016, 8:04 pm

3 buildings in the same site?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

We are looking to certify 3 same buildings. The buildings are exactly the same except the orientation.

3
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Thu Jul 21, 2016, 6:57 pm

BOD and OPR

CI-v4 EAp1:Fundamental commissioning and verification
posted by  Erin Rowe  on 

I am looking at an OPR for a project pursuing this credit, and it is quite high level.

3
Thu Jul 21, 2016, 2:10 pm

Efficiency of the chiller

NC-2009 EAp2:Minimum Energy Performance
posted by  Dandan Li  on 

Hello all, we are going to use ASHRAE 90.1-2010 for our LEED v2009 project in Germany. One problem pops up recently.

4
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Thu Jul 21, 2016, 9:58 am

Calculating % of Finished Floor FloorScore Certified

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Patricia Taylor  on 

I have been pouring over the SCS website for instructions on how to calculate the % of finished floor that is FSC for IEQ 4.3.

12
Wed Jul 20, 2016, 5:27 pm

District heating and cooling

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

I am going to model a building that is connected with a district heating/cooling system.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jul 20, 2016, 3:35 pm

Sport Flooring Vent Cove Base

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Michelle Rosenberger  on 

I have a YMCA that is installing wood flooring for their gymnasium. They are required to install vent cove base with this kind of floor.

2
Tue Jul 19, 2016, 9:40 pm

ASHRAE Baseline Constructions

NC-2009 EAc1:Optimize Energy Performance
posted by  Alice chen  on 

Hi All, I am working on a large warehouse building with a small office building on the site. The warehouse is heated only, so I suppose that is semiheated space, is that right? While the office

4
Senior Energy Wizard
TLC Engineering Solutions
LEEDuser Premium Member
44 thumbs up
Tue Jul 19, 2016, 4:43 pm

Daylight controls

CI-v4 EAp2:Minimum energy performance
posted by  Gabriela Crespo  on 

Dear all, We are working on a project to be certified CI v4. The use is a software development office, the building is 100% glazing in a very hot climate.

2
Default Avatar
Building Systems Commissioning Engineer
Empirical Engineering, LLC
LEEDuser Basic Member
14 thumbs up
Mon Jul 18, 2016, 6:46 pm