Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

carpet

EBOM-v4 MRc3:Purchasing - facility maintenance and renovation
posted by  Pablo Fortunato Suarez  on 

This is related to the previous query. I see no reference to certification from the Carpet and Rug Institute which was present in v3.

3
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Feb 6, 2017, 5:30 am

Documentation: calculating grey water and rainfall - irrigation

NC-2009 WEc1:Water Efficient Landscaping
posted by  John Covello  on 

Hello Everyone, I am seeking further clarifications and suggestions regarding the clacuation for the use of grey water for irrigation and rainwater for our project.

3
Default Avatar
Senior Sustainability Manager
UL Solutions
LEEDuser Premium Member
7 thumbs up
Sat Feb 4, 2017, 7:16 am

Confusion over adjacency and shared systems

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  GBD Architects  on 

Hi all, We are looking to certify a new childcare building on a higher-ed campus that will be sharing HVAC systems with an existing childcare building.

4
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Sat Feb 4, 2017, 4:07 am

Water closet & Blow-out fixture

Healthcare-v2009 WEp1:Water use reduction
posted by  Ivy Lin  on 

In the template of WEp1 ,what the definition between the words" water closet" and "blow-out fixture" according to the table WEp1-3 (flush fixture data)? (Plz no literally meanings on these words.)

4
Fri Feb 3, 2017, 6:00 pm

Embedded Electric Conduits Adhesive

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Mario S.  on 

Does cement adhesive for electric PVC conduits that are embedded in concrete walls has VOC content requirements in IEQc4.1? If yes, what is the VOC threshold?

6
Fri Feb 3, 2017, 5:39 pm

Can a LEED AP ID+C v4 earn IOc2 EBOM 2009 ?

EBOM-2009 IOc2:LEED Accredited Professional
posted by  Izabela Kwiecinska  on 

Hi Everyone, I am working on LEED EBOM project that was registered in 2009 system. The same time I am preparing for my LEED AP exam (have chosen ID+C speciality).

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Fri Feb 3, 2017, 3:04 pm

Garage materials

NC-2009 MRc4:Recycled Content
posted by  Brightworks Sustainability  on 

Hi everyone, I am working on a new building project where a garage outside of the LEED boundary will be constructed concurrently.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Feb 2, 2017, 11:37 pm

LEED Form for Natural Ventilation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Erica Downs  on 

Does anyone have an example of a LEED Form completed for natural ventilation they would be willing to share? There does not appear to be one in the "documentation toolkit".

3
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Thu Feb 2, 2017, 3:48 pm

G3.1.1. Additional system types for nonpredominant conditions

NC-2009 EAp2:Minimum Energy Performance
posted by  Charalampos Giannikopoulos  on 

We’ve got a comment for a hotel project that “secondary HVAC systems should be specified in the Baseline building if any of the exception(s) from G3.1.1 are applicable.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 2, 2017, 10:34 am

FloorScore credit on wall applications

NC-v4 EQc2:Low emitting materials
posted by  Rick Farrell  on 

If a FloorScore certified product, specifically a pre-finished engineered wood floor, is applied to a wall or ceiling application does the product contribute to the EQc2 credit in LEED v.4?

4
Independent consultant on VOC issues
formerly with Eurofins Product Testing A/S
LEEDuser Basic Member
246 thumbs up
Wed Feb 1, 2017, 6:41 pm