Building Entrances
NC-v4 EQp2:Environmental tobacco smoke controlposted by Johanna Scogin on
We have some overhead rolling doors (for trucks to enter the garage portion of the commercial building) along with some man doors.
View Preserving Shade
Retail-CI-v2009 IEQc8.1:Daylight and views - daylightposted by Lon Stephenson on
Is there any criteria as far as what a View Preserving Shade actually is? There are openness factors as low as 1%; yes, you can see through them, but not much.
Recycled Water
CI-v4 WEc1:Indoor water use reductionposted by ESD Engineer on
The building our project is located in uses municipally supplied recycled water to serve the supply to the water closets and urinals. Can this be used to calculate additional savings?
Equipment as per table 6.8.1.A 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, In the project we are modeling, there are air conditioners which are supposed to operate in cooling mode at OA temperature close to the design heating OA. In this table and also in othe
DES Engineering Analyis to Determine Losses Path 2
NC-v4 EAp2:Minimum energy performanceposted by Ryan Hoffman on
The LEED v4 Reference Guide offers three was of determining equipment efficiencies, distribution losses, and distribution pumping energy: Monitored data, engineering analysis, and default values.
DES Path 2 Engineering Analysis for Losses
NC-v4 EAp2:Minimum energy performanceposted by Ryan Hoffman on
The LEED v4 Reference Guide offers three was of determining equipment efficiencies, distribution losses, and distribution pumping energy: Monitored data, engineering analysis, and default values.
Combined Purchasing
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by Ryan Hoffman on
The project in question is the north building of a 2-building, 1 million sf facility.
material streams
CI-v4 MRc6:Construction and demolition waste managementposted by Sean Quinn on
We are working on a project where there is not enough room for on-site separation, and the commingled waste will be picked up by the sorting facility.
Alternate Compliance path for EU projects: IEQc2
NC-2009 IEQc2:Increased Ventilationposted by Shaily Rungta on
We are working on a v3 design phase project in Switzerland that is using SIA (swiss standard) as the design Ventilation rates.
CFD Model
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by ESD Engineer on
I'm currently working with a CFD modeler for the contaminants portion of this credit. We're having trouble finding the generation rates per square foot of active contaminant.