EBOM-v4 EQc4:Interior lightingposted by Alexa Stone on
Can someone please send me the pdf sample from StopWaste.org? I can't open it from here. Thanks! Alexa www.ecopreserve.net
40 CFR 59, Subpart D (EPA Method 24)
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Deborah Lucking on
We have a traffic coating product that has VOC below 350g/L, and is compliant with 40 CFR 59, Subpart D (EPA Method 24).
simple box model
NC-v4 IPc1:Integrative processposted by Courtney Royal on
how do you define a simple box model? for example, do you need to model thermal zones, etc.
TI scope vs. CS base building
CI-v4 EQc9:Acoustic performanceposted by Michelle Rosenberger on
How do we achieve this credit based only on TI scope of work?
Sea Water Cooled Chiller Modeling
NC-v4 EAp2:Minimum energy performanceposted by Sefa Sahin on
Dear All, Our project building is located in Istanbul/Turkey. Cooling will be provided by centralised two chillers. There is not a cooling tower.
Can this credit be achieved if no minimum local code requirement
CI-v4 LTc5:Reduced parking footprintposted by Juliana Moreira on
I am working on an office fitout in central London where there are no minimum local code requirements for parking spaces.
Offsite donation compensation
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Cesar Ruiz on
I have a project with a large previously developed area.
Occupancy from areas not in LEED scope
CS-2009 PIf3:Occupant and Usage Dataposted by David Lazaro on
Hello, We are certifying a building which has undergone a major renovation above grade.
How to apply base ratios for non-specified usage type?
CI-v4 LTc5:Reduced parking footprintposted by Jonathan Weiss on
For a laboratory / office building, how do you apply the baseline? It appears that you pro-rate the usage by area of each space type, but laboratories are not a listed usage type.
Account for local and utility central energy plants
NC-v4 EAp2:Minimum energy performanceposted by S. Sachs on
We are building an addition to an existing building that has a central plant that is outside of our LEED boundary. However, we also have a contract to improve the performance of the central plant.