Forum quick links
Open mall shopping centre baseline model
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
I'm currently working in a project of a shopping centre (common areas + tenant areas) pursuing LEED certification (Core&Shell).
Diverse uses located within LEED project boundary
NC-v4 LTc6:Bicycle facilitiesposted by Ricardo Sá on
I'm working on a shopping center development that will include at time of occupancy more than 10 diverse uses within project boundary.
Amount of rainwater treated with a storage tank
NC-v4 SSc4:Rainwater managementposted by Ricardo Sá on
Hi all, I'm working on a project that is pursuing LEED certification.
self-levelling compound
Retail-NC-v2009 IEQc4:Low-emitting materialsposted by stefano pieretti on
Does anyone know which categories of low emitting materials is the self-leveling compound ?
LEED O+M: Multifamily
NC-v4 MPR3:Must comply with project size requirementsposted by Adam Stoker on
Where can I go to find information on the project size requirements for LEED O+M: Multifamily projects?
Option 2. Connectivity
ND-Plan-v4 SLLc1:Preferred locationsposted by Sarah Kearney on
I want to make sure I understand this correctly.
New Equipment with or without 0.5lb of Refrigerant
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Michelle Rosenberger on
I have a project with a cafeteria that has a custom walk in cooler and a variety of refrigeration units.
Measuring through connection interval distance
ND-Plan-v4 NPDc6:Connected circulation networkposted by Ian Scott on
Where the project boundary is located on the project side of adjacent ROW is through connection distance measured between ROW centrelines at the project boundary or at the adjacent ROW centreline.
SFI vs FSC
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Leanne Conrad on
Does anyone know if GBCI will accept a Sustainable Forestry Initiative certified sourcing label instead of FSC?
shower requirement - total FTE vs peak FTE
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Erin Holdenried on
Has anybody used peak FTE (as opposed to total FTE) to calculate the required number of showers? And was it accepted by the GBCI reviewer?