Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Critical zone

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Charalampos Giannikopoulos  on 

IEQp1 form v06 has a new requirement to describe "how critical zones are selected and how all occupiable zones are accounted for in the determination of the critical zone.

1
Wed Nov 2, 2016, 12:49 am

glare control features in retail

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Anna Bak  on 

Hi, I'm working on the building that on the ground floor has an entrance lobbby with a desk for receptionist and some retail space. On the upper floors we have an office space.

1
Thu Oct 20, 2016, 1:34 pm

Open Space

NC-v4 SSc3:Open space
posted by  Jorge Lopez de Obeso  on 

Hi, in order to getting to know the new V4 we are taking a look at each credit and start to getting familiar with them. The leed reference guide doesn't use the same project in both examples for fu

1
Wed May 31, 2017, 2:38 pm

worksheet language

Healthcare-v4 IPc1:Integrative process
posted by  Duncan Griffin  on 

The worksheet is somewhat vague about the language that would satisfy LEED reviewers - for example, Site Conditions Baseline assumptions or Massing/Orientation Baseline assumptions could be broad o

1
Tue Jan 17, 2017, 8:49 pm

no permanent workstations

CS-2009 MPR5:Must comply with minimum occupancy rates
posted by  Agnieszka Rylska  on 

My Client is renovationg a few floors of his office. The renovated floors would only contain canteen, gym and conference rooms without any permanent work stations.

0

Existing HVAC system efficiency

CI-v4 EAp2:Minimum energy performance
posted by  Richard Mathews  on 

Let's say I'm doing a tenant job in an existing office building, and the tenant is served by an existing rooftop AC unit.

1
Wed Jan 18, 2017, 11:51 pm

LEED certification submittal

NC-v4 MPR3:Must comply with project size requirements
posted by  Pam Lynch  on 

Hello, I am currenty studying for the LEED GA exam.

1
Wed Oct 12, 2016, 5:10 am

Recommended values for Met and CLO and size of zones

NC-v4 EQc5:Thermal comfort
posted by  Sandra Holmström  on 

Hi! Is there any recommended value för Met and CLO that you must use when you perform your calculation of PMV/PPD etc? Is there any recommended size of the zones that require thermal comfort Cont

0

Diversity factors in ventilation rates calculation

Schools-2009 IEQp1:Minimum IAQ Performance
posted by  mingyu Zhang  on 

Our project in China is a K-12 school which consist of 2 learning buildings, a sport center and a performing center. When we compare the ventilation rates calculated according to ASHRAE 62.1 with L

1
Tue Jan 24, 2017, 1:57 pm

Separation Method For Garages

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Ciaran McCabe  on 

Hi, What should we enter as the Separation Method for a Carpark with mechanical supply and exhaust which is open to outside via the carpark ramp. Thanks.

1
Thu Oct 13, 2016, 8:00 pm