Forum quick links
Industry benchmark comparison reports
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Omar Delgado on
Greetings, I'm trying to find a benchmark comparison report for manufacturing plants but have had no luck so far.
Lighting,people, and equipment diversity.
NC-2009 EAp2:Minimum Energy Performanceposted by Eric Wright on
I am modelling a large multi use building where the peak occupancy never rises above ~70%. Different areas of the building are used on different days but never all at once.
LEED Lab
Pilot-Credits IPpc96:LEED Labposted by Stacey White on
Cuesta College typically holds two LEED Lab sessions a year. We are lucky to work with several Community Partners working on projects in every rating system.
Controls for Open Plan Work Stations
CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Ciaran McCabe on
In relation to the open plan offices. If we have an area where 6 people work served by one fan coil unit. The fan coil unit can be controlled via the BMS.
Green Roof and Certification
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Patrice McVeigh on
Hi All, I'm working on a core and shell project.
SSc4.2 Bicycle Storage for a mixed-use Hotel/Commercial Space
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Bhavin Pardiwala on
Hi, I'm currently working on a mixed-use Hotel and commercial space in Chicago. I was wondering if Hotel guests would be accounted for in determining number of bike racks or storage space.
Provide the source of data
Healthcare-v2009 MRc4.2:PBT source reduction - lead, cadmium and copperposted by Matt Luedders on
Under the lead section, the credit language includes the requirement to "Upload lead documentation.
Building Flush - Filter Change?
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Brianne Smith on
Our project is pursuing Option 1 Path 2 - Flush During Early Occupancy. Do filters need to be replaced after the flush, or only after construction as part of IEQc3.1?
DCV requirement for high-occupancy areas
CS-2009 EAp2:Minimum Energy Performanceposted by Shenhao Li on
Hello! We have a canteen project in Shanghai. The building has three floors, total GFA is 64,067 square feet. The baseline HVAC system type is system 6.
CI - ID Credit for Cooling Tower Collection
CI-2009 IDc1:Innovation in Designposted by Rachel Manoguerra on
I'm working on a CI project where a 1000 gal storage tank will be set up for the collection of water from the cooling tower. We are not taking credit for it in our WEc1 Waste Water Credit.