Forum quick links
Energy star
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Yaser Al Sharif on
I am working on cl commercial project , when we resisted to the leed certificate we didn't have any energy star equipment's in our building , but to achieve more points we decided to replace our eq
Does an indoor sewage pit need exahust for EQc5?
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Kristopher Lashley on
We have a project where there is a sewage pit located on floor P2 of the parking garage.
Energy star
CI-2009 EAp2:Minimum Energy Performanceposted by Yaser Al Sharif on
Energy star I am working on cl commercial project , when we resisted to the leed certificate we didn't have any energy star equipment's in our building , but to achieve more points we decided to
LEED for Neighborhood Development + Walkable Project Site
Pilot-Credits PC14:Walkable Streetsposted by Nikki Wildman on
We just wanted to share a little of our experience with this credit.
Exterior Lighting Baseline vs Proposed
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Unruh on
I'm trying to understand baseline exterior lighting versus the proposed. My calculations show that my proposed is less than my baseline, is this okay?
initial fit-out vs alteration?
Retail-CI-v2009 PIf2:Project Summary Detailsposted by Andrew Bennett on
What is the difference between initial fit-out and alteration square footages?
90% controls for open office systems furniture
CI-2009 IEQc6.1:Controllability of Systems—Lightingposted by Brian VanAllen on
As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices?
IEQp1
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gordon Nielson on
I am having troubles understanding what is a single zone system and a multiple-zone system and how to fill out the forms.
Rating System Path
ND-v4 MPR2:Must use reasonable LEED boundariesposted by Philippa Cameron on
Hi, Can you please help me confirm how we verify LEED ND: Built Project as the suitable rating system path to follow, and set the boundary to accommodate this? The guidance states that: a.
Off-site area counted for two LEED projects
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Anna Korinkova on
There are two buildings to be certified, the same Owner, located on the same campus.