Forum quick links
LEED CI parking
CI-v4 LTc5:Reduced parking footprintposted by Donna Juselis on
Our project is a remodel of the 2nd floor of a 3 story office building (CI v4).
Low-flow WaterSense Devices
NC-v4 WEp2:Indoor water use reductionposted by MAUDE PINTAL on
Hello
Do you know models of bathroom faucets with a 0.5 gm flow that is WaterSense certified or certified aerators that can get the same flow?
Thank you,
Corridors around data hall is considered as non occupied space?
Data-Centers-NC-v4 EQc9:Acoustic performanceposted by Afogreen Build on
Hi all,
Humidifier
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Spastri on
Hi, Our project is going for LEED. We have 2 proposed CRAC system that have humidifiers.
Are they going to update this credit now that COVID is considered endemic?
Pilot-Credits INpc137:Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Torsten Biernat on
The basic premise of this credit was created at the height of the pandemic. Does USGBC plan to update it now that vaccines are widely available and knowledge of the virus is commonplace.
Baseline system in ASHRAE 90.1 G3.1.1
NC-v4 EAp2:Minimum energy performanceposted by Eric Dyer on
Hello,
I have a question in the process of creating a baseline system in our modelling.
Our project is in System8.
LEED baseline model with proposed increased ventilation and pressurization
NC-v4.1 EAp2:Minimum Energy Performanceposted by Moses Chong on
Has any one worked on LEED project that includes increased ventilation credit AND the project has an pressurization-based ventilation rate? What should I do with the baseline model?
Fire and Police Station Building Type Use
NC-v4.1 LTc7:Reduced Parking Footprintposted by Danielle Waters on
I saw on LEEDuser v4 NC LTc7 that Fire Stations could be "General Light Industrial" (1.85/1000 sf), but is it far fetched to consider "Other Public Assembly" (0.25*permitted capacity) if the commun