adjustable Dual Flush valve
NC-2009 WEc3:Water Use Reductionposted by Faisal on
Hi, we are evaluating a dual flush valve for WC, which give us 6 & 9 Litres per flush(adjustable) which aggregates to 7 litres per flush, our project requirement is 3.023 Litres per flush(0.8
Heat gain originating from hooded equipment in energy modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
I am doing energy simulations for a factory.
Counters
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Gustavo De las Heras Izquierdo on
Hallo, We are certifying an airport and we would like to know if the counters need to have task lighting. The IEQ Space Matrix does not include this type of building. Thank you
Renewable Energy
CI-v4 EAc4:Renewable energy productionposted by Maria Glädt on
See quotation from LEED-CI. "Use tenant renewable energy systems to offset the project’s energy cost.
Regional Materials - Steel
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Catherine Blakemore on
In order to get regional material credit for steel can an average percentage be used of all the mills that sourced scrap within 500 miles of the project site? For the Extraction Distance can the m
Filter Replacement
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Andrew Ellsworth on
BACKGROUND: We have a project that is an office building pursuing LEED-CS 2009 certification. The C&S was substantially complete within the last several weeks.
IEQp1 - LEED CI 2009
CI-2009 IEQp1:Minimum IAQ Performanceposted by Aparna Maladkar on
Hi, I have completed an offline (active) IEQp1 form which shows that pre-requisites are being met. When I complete the same form online, the result is that the pre-requisites are not being met.
Existing Building Flooring Reuse
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Charalampos Giannikopoulos on
For an existing building under major renovation would the reused flooring be exempt from the credit requirements and should only new flooring to be installed comply with the requirements in order t
Wood floor coating VOC limit
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Agnes Vorbrodt on
Would a (site-applied) solid wood floor coating fall under "clear wood finish" with the limit of 350g/L or a "floor coating" with the limit of 100g/L? Thanks!
Acoustic performance
Data-Centers-NC-v4 EQc9:Acoustic performanceposted by neeraj arora on
How to calculate composite STC for a room?