Hi all, My project has all 5 categories installed (dishwasher with racks, pre rinse etc..), however one of the products is above the maximum limit. Since they are installed, do I have to include them for credit documentation or can I simply include the minimum of 4 categories. I feel as though I will need to include them all, but wanted to reach out and confirm. Best!
Sustainable Design Consulting
LEEDuser Basic Member
20 thumbs up