Forum quick links
Project vs Lighting boundary
NC-v4 SSc6:Light pollution reductionposted by Bill Swanson on
There appears to still be confusion on the differences between the Project Boundary and the Lighting Boundary. The Project boundary is the same as shown in every other credit.
ny exception for the minimum 5% energy cost saving before renewable energy
NC-v4 EAp2:Minimum energy performanceposted by Moses Chong on
I have a project with 2 building in LEED V4.
Pilot-Credits EQpc57: Enhanced acoustical performance - exterior noise control
Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise controlposted by Olawale Taiwo on
Hello Sound & Acoustic Specialist (LEED APs),
Please I need a quick confirmation on this Pilot credit EQpc57.
Walkable Project Site Innovation credit applicable to a university campus building?
NC-v4 INc1:Innovationposted by Darrah Jakab on
I'm working on a higher ed building in a pedestrian-only area of campus that I believe would be a good candidate for this credit. Has anyone had sucess in achieving this credit for a college c
View Type 1 with non-continuous window glazing
NC-v4 EQc8:Quality viewsposted by Edgar Arevalo on
I have a library that has a reading area with windows surrounding all sides but are separate by the interior wall, which makes the glazing non-continuous. The wall space between windows are a
"Weighted sum of non-roof and roof measures" Issue
NC-v4 SSc5:Heat island reductionposted by Edgar Arevalo on
Under the Summary of Heat Island Reduction Measures, the footnote says "Weighted sum of nonroof and roof measures must be greater than or equal to sum of project paving and roof area for 2 points."
MERV Filters for PM 2.5
NC-v4 EQp1:Minimum indoor air quality performanceposted by Banu Banu on
Dear All,
In our project we have Direct Evaporative coolers . It is a garment production building. In Evaporative coolers, usually the process is mixing of Air & water.
LEED Daylight Simulation Option1 with IES-VE
NC-v4 EQc7:Daylightposted by Mahshid Sedighimoghaddam on
Hello everyone,
We are doing Daylight simulation with IES-VE software in compliance with LEED daylighting Option 1.
Desiccant Wheel Modeling for Baseline case
NC-v4.1 EAp2:Minimum Energy Performanceposted by John on
I am working on a model which has Desiccant wheel in design case. Do we need to model desiccant wheel in baseline case as well?
Thermal Comfort Control
NC-v4 EQc5:Thermal comfortposted by Martin Maribo on
How can individual thermal comfort controls be achieved for individual workstations in an open office?