Forum quick links
Other Buildings On Site
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by John McLean on
I have a group of 5 existing buildings on a brownfield site, two are being reused and 3 are being demolished.
Campus parking division
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Sally Marr on
This question relates to both SSc4.3 and SSc4.4. I am working on a student union building for a college campus.
Truck parking for manufacturing plant
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Katherine Ann Resurreccion on
Hi, our manufacturing plant project has a lot of truck parking slots for unloading and loading of products.
Base Building
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Keerthi Ratnayake on
Hi, What does it mean by "base building" in the credit language? Thanks in advance.
Ventilation and Energy Efficiency
NC-2009 EAp2:Minimum energy performanceposted by Keerthi Ratnayake on
Hi, We are designing a building for tropical climate condition and thinking of having natural ventilation and mechanical ventilation only. i.e.
Carpet with GUT certification, what about caprolactam?
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Ward Miller on
We are working on a big box store in Europe striving to achieve this credit, but differences between the standard Green Label Plus and ACP approaches seems to be causing questions related specifica
Preferred Parking for employees or visitors?
CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by mary ostafi on
Our building has 2 main entrances, one in back where the employees park and one paid lot in front where visitors and general parking is located.
Electrical PVC Cement
CI-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Landis Wilson on
My electrical contracting company is using PVC for underground applications(e.g. floorboxes). I assume that it should be characterized under the PVC welding VOC limits of 510g/L.
LEEDuser template updated
EBOM-2009 SSc2:Building exterior and hardscape management planposted by Tristan Roberts on
For our members, LEEDuser has updated Section 9 of the Building Exterior and Hardscape Management Plan Template that we offer in our Documentation Toolkit above.
Base Building Ongoing LEED Certification
CI-2009 SSc1:Site selectionposted by Nick Chiarelli on
The base building is currently undergoing construction and their LEED certification will not be ready for a couple months.