Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Forklifts as Individual Workstations

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  Craig Wilson  on 

I am working on certifying a warehouse, and would like to consider the forklifts as individual workstations, as the warehouse employees are each assigned one (in lieu of a desk) and allowed to pers

1
Wed Jul 31, 2013, 3:44 pm

Vehicle tracking control dirt road

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Juan Robles  on 

We are working on a project in Costa Rica where the access road is a dirt road.

1
Fri Jul 12, 2013, 3:04 pm

Full Height Glazing

Healthcare-v2009 IEQc8.2:Daylight and views - views
posted by  Lauren Bellamy  on 

Per step 2 for noninpatient buildings and areas "for portions of the perimeter wall with full-height glazing, the qualifying area may be extended beyond the 15-foot limit to twice the head height o

0

raised floor

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Florinda Garcia   on 

does the raised floor has to meet the floorscore requirements?

1
Tue Jul 16, 2013, 4:56 am

extraction location for petroleum based raw materials

Pilot-Credits MRpc53:Responsible sourcing of raw materials
posted by  Melissa Vernon  on 

I am working on documentation for this credit but need some advice.

0

extraction location for petroleum based raw materials

NC-2009 MRc5:Regional Materials
posted by  Melissa Vernon  on 

I'm cross posting my question here, as it pertains to LEED v4 raw material sourcing, and in documenting regional materials, others may have encountered the same issue. I am working on documentatio

1
Tue Sep 17, 2013, 9:13 pm

Free Thermal Comfort Tool

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Julia Weatherby  on 

Many thanks to Christopher Schaffner for linking in his post below to the Berkeley CBE free online comfort tool at: http://cbe.berkeley.edu/comforttool/ I use the Windows XP operating system, and

0

Mechanical enclosure non-roof?

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Nicole Kimoto  on 

Can we include the concrete paving provided in our project as part of the non-roof area?

1
Mon Jul 15, 2013, 3:31 pm

Military installation with male dominated population

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Joanna Switzer  on 

I am part of a team working on a multiple building complex LEED project at an Army Infantry installation.

0

SS7.2 question about form

Schools-2009 SSc7.2:Heat Island Effect—Roof
posted by  John Paul Chulliyil   on 

Hi all, I am in the middle of working on the SSc7.2 roof for and a bit confused. We are using a High albedo material covering 100% of the roof.

1
Mon Jul 15, 2013, 8:12 pm