Forum quick links
Bicycle sharing for ID credit
CI-2009 IDc1:Innovation in designposted by Vickie Chen on
Dear all, Our client is a manufacturer of "electric bicycle" and they are thinking of introducing electical bicycle sharing programme for their retail project, or donating electical bicycles to the
Hospital Application
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by Alexa Stone on
Could anyone shed some light as to how they might approach this PR with a hospital. There international restrictions on the use of aerators on facets, sinks etc because of pathogens.
exclusions
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Nate Maniktala on
Hi there, I was wondering if there are exclusions to some of the pieces of equiptment that would qualify as Energy Star?
LEED-CI Cx after occupancy?
CI-2009 EAp1:Fundamental commissioning of building energy systemsposted by Leticia SooHoo on
I am working on a proposal for a LEED-CI project.
Baseline Fan Power: Systems 6 and 8 ASHRAE 90.1-2007 Appendix G
NC-2009 EAp2:Minimum energy performanceposted by TOMAS URIBE on
If our Baseline building design HVAC system is ASHRAE’s #6 or #8 (according to TABLE G3.1.1B).
Inert post-installation materials
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Andrew Gil on
I am remembering hearing of an addendum, errata or CIR, clarifying that materials that undergo a chemical reaction DURING installation (e.g.
Plastics/PVC and Flooring
EBOM-2009 MRc9:Solid waste management - facility alterations and additionsposted by Kim Wajda on
Neither are mentioned in the Solid Waste Conversion Factors table in the EB O&M manual so I calculated their conversions from pounds to cubic yards using the given density for "Mixed waste".
Basis for Individual Controls Count
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by Terry Gorski on
For the individually occupied spaces in a typical office building, how close to the FTE occupant number being used in PI Form 3 does the total building occupant number being used for this credit ne
Thoughts about this pilot credit
Pilot-Credits SSpc55:Bird collision deterrenceposted by Todd Henderson on
We're attempting this pilot credit on a hospital here in San Francisco, California. I have some thoughts about the building facade requirements that I'm curious if anyone has also encountered. 1.
About Power Meter calibration report required in EAp2
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by NGUYEN THUY on
Our performance period start from May to July, but we just can calib the power monitors in next shutdown in August.