Forum quick links
Baseline HVAC Selection
NC-2009 EAp2:Minimum energy performanceposted by April Rice on
We have a 5 story non-residential building (located on a campus), with a mechanical penthouse (with roof) above.
Walk-off at Loading Docks?
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Heather Schafer on
I am working on 2 University projects, both seeking LEED certification. Both buildings have loading docks with a back-of-house entry.
FTE or School population?
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Nelina Loiselle on
The ITE Parking Generation Study refferences school population for units in determing # of parking spaces for University/college buildings.
SS 5.1 Case 2. Previously Developed Areas or Graded Sites
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Ray Argue on
Within the notes to this LEED gives specifics on 'previously developed areas', but I have not come across what there definition of 'graded sites' is. A current project has a natural grade on the s
Zone Air Distribution Effectiveness
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Noriko Nagazumi on
Let me confirm the following ASHRAE 62.1-2007 Zone Air Distribution Effectiveness (Ez) issue. Our project utilizes total heat exchangers for ventilation.
Baseline in LEED reference guide and IPMVP
NC-2009 EAc5:Measurement and verificationposted by Karoline Geneser on
Considering EAc5, both LEED Reference Guide and IPMVP use the term “Baseline”.
Commissioning existing energy systes
CS-2009 EAp1:Fundamental commissioning of building energy systemsposted by Ken Dooley on
We have building renovation that is refurbishing 80% of a building aiming for CS 2009.
Achieving IEQp1 with no ventilation systems for C&S project
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Tony Schafer on
I’m wondering about how to comply with this credit for a C&S building that, upon initial completion, will be just a big warehouse space with no ventilation and the only HVAC equipment will be u
Retail Space inside a Shopping Center
CI-2009 SSc3.3:Alternative transportation - parking availabilityposted by Sustentator Argentina on
We are looking to certify a retail space inside a huge shopping center under Commercial Interiors (not as Retail Commercial Interior, the shopping is NOT certified) We are considering that our shop
facade lighting savings
CS-2009 EAc1:Optimize energy performanceposted by Puteri Shireen Jahnkassim on
Dear Marcus We conducted an energy simulation analysis and included Facade lighting as one of the energy saving features.