CI-2009 EAp2:Minimum Energy Performanceposted by Paul Meyer, PE, CEM, CBCP, GBE LEED AP on
Currently working on a project in which all HVAC mechanical systems were existing. Only the ductwork was installed.
ASHRAE 90.1 2007 Section 9.4.1 Automatic Lighting Shutoff
CI-2009 EAp2:Minimum Energy Performanceposted by Ashonta Langdon on
Hello! We're working on a TI office project of less than 5,000 sf in a building that is larger than 5,000 sf.
Brazilian equivalent standard
CI-2009 EAp2:Minimum Energy Performanceposted by Aline Luther on
I would like to know if there is any Brazilian Standard that can substitute the ANSI / ASHRAE / IESNA Standard 90.1-2007.
Interactive Compliance Forms.
CI-2009 EAp2:Minimum Energy Performanceposted by elizabeth warlop on
If I am not altering the HVAC, Or Building Envelope, or Service Water, Do I have to fill out the Interactive Compliance Forms, ie the Building Envelope, the HVAC Compliance the Service Hot water.?
Owner installed lighitng
CI-2009 EAp2:Minimum Energy Performanceposted by Allen Cornett on
I am trying to find out if a building owner is installing new lighting in a space, will a future tenant be able to included the existing lighting in the lighting power density calculations for EAp2
EAp2 Equipment Motors
CI-2009 EAp2:Minimum Energy Performanceposted by Eric Claycamp on
For a LEED CI project that includes a fitness center, do you count the motors in the treadmills and cross trainers? No fitness equipment I have found is Energy Star rated.
CI Project retail Store - EA PR2, ASHARAE 90.1, Section 9.4.1.2
CI-2009 EAp2:Minimum Energy Performanceposted by Sustentator Argentina on
Hi, I have a question regarding the Space Controls. The controls installed, control the spaces remotely and they are located inside the electric panel.
Energy star
CI-2009 EAp2:Minimum Energy Performanceposted by Yaser Al Sharif on
Energy star I am working on cl commercial project , when we resisted to the leed certificate we didn't have any energy star equipment's in our building , but to achieve more points we decided to