Office Building Outside US
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Omer Moltay on
Which path is to be followed for an office building outside the US? Is this considered to be eligible for an Energy Star rating?
Central Plant Re-Location
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Reynaldo Castro on
Hello we are a LEED-EB O&M V3 Certified Project and are planning a major remodel of our existing building. Including Re-Location of entire existing central plant.
Expiring Energy Star Rating and Eligibility for LEED
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Nelina Loiselle on
I have a large high rise with a data center in it. It's last Energy Star rating was September 2010.
Energy Bills are the Entire Site and Not Broken Down by Building
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Cynthia Fowler on
My project building is one of 40+ on a company's campus/site. They do not purchase electricity on a building-by-building basis, but for the entire site.
Energy Star approach for multiple buildings
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Erin Holdenried on
I am working on a LEED project that was registered under LEED EB: O&M 2008 that is obtaining one LEED rating for the campus.
EAp2 CaGBC Calculator
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Emma Sanborn on
I am working on achieving LEED for a convention centre in Canada.
Portfolio Manager Solar Data
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Nell Boyle on
We have a grid tied solar array that we regularly sell energy back to the utility. The LEED form clearly states that they are interesteded in all solar generated, which is 23.5 Mwh.
What About Multi-Family Residential Buildings?
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Lance Collins on
Multi-family residential buildings are currently not eligible to receive an Energy Star score in Portfolio manager.
Data center --IT energy sub meter calibration
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Shoko Yasuda on
Hi, I am involved in EBOM case with a data center. As noted above, basically we do not need calibration since we use data from utility bill. Yet for a data center we have to measure UPS output ener