Forum quick links
One Conductivity Meter for Multiple towers
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Jessica Hawley on
On our project building there is only one system meter. All cooling towers are interconnected with a single header which is monitored by the conductivity meter.
Using Rainwater for Cooling Tower Make-up
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Kevin Krejci on
Thinking of doing a feasability study on using rainwater from garage run-off for cooling tower make-up. Has anyone been down this road and is willing to share challenges / successes?
DEC - EBOM
EBOM-2009 WEc4:Cooling Tower Water Managementposted by babu rajendran on
My project getting chilled water from District energy center which has cooling towers.
Non Potable Water Source Use
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Rajesh Ghorla on
What QC process can be added to identify variances from Standard Approach and what measures can be take.
WE 4.1 TEMPLATE
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Adriana Hansen on
In our project the towers has the following water cooling consumption during the Performance Period: Potable: KGALI 52.16 (4% of total) Non Potable: KGALI 346.71 (96% of total) TOTAL: 398.87 In m
Cooling Tower for Back-up Diesel Generators (DG)
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Anshul Chawla on
The project site has 3 cooling towers of 215 ton capacity each. These cooling towers serve the HVAC system of the building and are operational for 8-10 hrs on all working days.
Pursuing this Credit for New Construction
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Michael Angell on
Would this credit be available as an ID credit under a project going for new construction? Or is there already a like credit that addresses these parameters?
WE Credit 4.2: Cooling Tower Water Management- non potable
EBOM-2009 WEc4:Cooling Tower Water Managementposted by satheesh M on
The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.
Drycoolers
EBOM-2009 WEc4:Cooling Tower Water Managementposted by WAGNER OLIVEIRA SILVA on
We work on a project that has Drycoolers, all water user is non-potable. Since there is no closed loop and make up water this system there no treatment. Can we pursue both 4.1 and 4.2 credits?
Would an Evaporative Cooler Be Considered a Cooling Tower?
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Michelle Bracewell-Musson on
We have 2 cooling towers and 4 evaporative coolers (Climate Wizard). Would these all be considered cooling towers with reference to this credit?