Construction IAQ management plan - before occupancy
Filter by location
Forum
Topic
Replies
Recent

Air Testing Requirements - TICs

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Chad Mapp  on 

Our team decided to perform air quality testing before occupancy on a recently completed building. We have had some question over which method is required for tVOC testing and for what compounds.

1
Sat Nov 16, 2013, 1:23 am

Permanent furniture

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Pascal Genest-Richard  on 

We would like to know if it is possible to start the flush out (and maybe even finish it) before all permanent furniture is installed.

1
Sat Jul 26, 2014, 12:32 pm

Testing with multiple systems in one space

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Nate Steeber  on 

I've looked deeply into all the comments here, but I can't seem to find an answer - I apologize if this is a repeat, or too simple of a question: My project has many AHUs, in some cases two differ

1
Thu Oct 8, 2015, 8:40 pm

Option 2 Meaning of "Contiguous Area"

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Daniel Smith  on 

Some of the air handling units at the site (police station) where I will be conducting air testing serve more than one area on a given floor, and these areas are not directly connected to each othe

1
Mon Oct 31, 2016, 2:10 pm

IEQ3.2 IAQ MANAGEMENT PLAN - OPTION 2

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Jérôme Aruanno  on 

Hi, I am questioning about the second option, mesuring the contaminant levels. The table p 462 is indicating level to respect.

1
Tue Jun 28, 2011, 10:17 am

Renovation (occupancy never stopped) / 24-hour operation

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Alexandre Schinazi  on 

Hello, I am working on a project in Brazil with specific conditions that have brought up 2 questions concerning this credit.

1
Wed Dec 5, 2012, 9:56 pm

Option 2-Air Testing - Building with Phased Completion

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Lilian Seow  on 

We r building 424 residential units - 46 storeys high tower.

1
Mon Nov 4, 2013, 1:57 am

IAQ Management Plan

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Maura Adams  on 

We used an EQc3.1 plan and used the testing method to meet EQc3.2 requirements.

1
Thu Jan 5, 2012, 9:14 pm

Testing sampling location for independent ventilation system

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Lilian Seow  on 

Each of the 400+ residential suites is designed with an independent stand-alone ventilation system. According to the air testing requirement in pp.

1
Sat Oct 12, 2013, 5:51 am

Testing for Residential

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Donald Green  on 

I have read the threads for this credit as well as any LI that I could find to determine the amount of testing locations required.

1
Thu Aug 7, 2014, 2:48 pm