Construction IAQ Management Plan—Before Occupancy
Filter by location
Forum
Topic
Replies
Recent

Flush out by AHU volume or Floor volume?

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Aru Sau  on 

In this project, there are three floors ( with multiple rooms with interior walls with doors) with multiple AHUs serving from 100% OA intake to 20% OA intake.

0
1
Thu Apr 8, 2010, 2:49 pm

Defined Flush out Area

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Thomas Boyd  on 

Hello everyone - Our project's registration details reference building square footage as 51,441. However, we've only finished 40,100 sqft.

1
Sun Apr 29, 2012, 6:03 pm

Combination of Test and Flush

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Michael McVinney  on 

On a hangar project, there is a conditioned Admin space and an unconditioned Hangar space.

1
Thu May 30, 2013, 6:11 am

four IEQc3.2 questions....

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Carrie Laurendine  on 

1) ive looked at space matrix (this is a library project)... from what i gather EVERY space has to count.. even spaces not regularly occupied (mech closet, janitor closet, etc).

1
Sat Nov 16, 2013, 2:07 am

Flush-Out Requirement for a Naturally Ventilated Building

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Eric Carbonnier  on 

The project is an 8 story residence hall on a university campus. The building is not equipped with a central ventilation system and dorm rooms rely on natural ventilation.

1
Thu Mar 19, 2015, 10:43 pm

majority residential

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Courtney Royal  on 

Our project is a multifamily building with several common spaces on the cellar, main level, and top level of the building. However, majority of the building is apartment units.

0

Credit 3.2, Option 1, Path 2

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Douglas Blakeslee  on 

We are the GC for a new small (4,000 SF) Leed Certified fast food restaurant with 3,800 CFM of outside air when occupied. We plan to do our initial 3,500 CF/SF flushout over a weekend.

1
Wed Mar 23, 2011, 2:02 pm

Flush out in tropical climate region (Climate Zone 1)

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Adi Negara, LEED AP BD+C  on 

Hello, Our project is in Indonesia (Climate Zone 1), which happened have high humidity (70-85%) all year long. Our building design only incorporate natural ventilation and AC (VRF system).

0

Concerning Carpet

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Omar Elrawy  on 

Dear all, We have a project where we intend to pursue Option 1 Path 1, We will install furniture after completing the flush-out, but the architect is concerned about the carpet install

1
Thu Jul 3, 2014, 8:08 am