NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Sara Heppe  on 

Please verify that when calculating the minimum 25 linear foot distance from an opening to an exterior designated smoking area, whether or not the measurement can go around solid obstacles.

4
Default Avatar
Business Development Manager
Entegrity
LEEDuser Basic Member
154 thumbs up
Thu May 31, 2012, 3:09 pm

Signage Requirement

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Erin Cowan  on 

Is policy verbiage detailing the communication of no-smoking policy by signage strategically throughout a campus acceptable in place of actual drawings or photos?

2
Wed Mar 28, 2012, 5:51 pm

IEQ prerequisite 3

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  ROZANA SILVA  on 

Dear sirs: I was told by the LEEDuser team that I would find updated information related to LEED rating systems, but today I found out that IEQ prerequisite 3 was not included in the Leeduser site.

3
Thu Mar 1, 2012, 9:28 pm

Smoking within 25 feet

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Veronika Sundberg  on 

We have a possible LEED project for psychiatric patients that have committed a crime. In this building we also have holding cells for patient waiting for trial.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Dec 13, 2011, 2:01 pm

blower-door testing for hotel rooms with interior brick walls?

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Jutta Berns  on 

we have a hospitality project in south africa where a number of rooms will be (quietly) designated smoking rooms.

4
Sustainability specialist
Skanska Sweden
LEEDuser Basic Member
205 thumbs up
Wed Nov 16, 2011, 3:02 pm

Upload Blower Door test results in design stage?

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Maria Porter  on 

IEQp2 is a design prerequisite. For residential units, (smoking allowed), we have to upload blower door test results. Since it is in design stage, there is yet nothing to perform testing on.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Wed Nov 16, 2011, 2:06 pm

Campuswide and Multi Building Documentation

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Brian Moran  on 

Does anyone have experience demonstrating compliance for campuswide or multiple buildings? We would like to document this credit for campuswide submission.

2
Tue Nov 15, 2011, 5:26 pm

designated smoking areas

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Annette Bellafiore  on 

If you select the option that smoking is prohibited within 25' of the building, LEED Online asks you to indicate where smoking is allowed.

8
Fri Oct 7, 2011, 8:23 pm

case 2. Residential and Hospital Projects Only - Requirements

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Veronika Sundberg  on 

Hi, I have a question regarding case 2. Residential and Hospital Projects Only. In the requirement for the prerequiset 8 bullets are listed that needs to be met.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Sep 19, 2011, 9:12 am