Forum quick links
Existing building compliance
NC-2009 IEQp1:Minimum IAQ Performanceposted by Saju Varghese on
we have a new addition added to an existing facility.
Fresh air supply using Cooling pad in Production area
NC-2009 IEQp1:Minimum IAQ Performanceposted by SAMY Chamy on
Dear all Our project is single storied sewing factory in production area we have large size Exhaust fans in one side and opposite side of exhaust fan have cooling pad Now the issue is we can't p
IEQp1: Title 24-2008 in lieu of ASHRAE 62.1-2007?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Leticia SooHoo on
Fellow #LEED professionals: has anyone meet the requirements of IEQp1 using CA Title 24-2008 ventilation requirements in lieu of ASHRAE 62.1-2007?
VVT System
NC-2009 IEQp1:Minimum IAQ Performanceposted by Brian Kenney on
Hello, We have a design completed in California with constant volume packaged rooftops controlled as a VVT system. The owner is contemplating getting LEED certification.
IEQp1 ASHRAE 62MZ Calculator-Please Help
NC-2009 IEQp1:Minimum IAQ Performanceposted by Helen Williams on
Help please! I have to submit the 62MZ Calcualtion today on a Storage Facility Project. IEQ Prereq 1 was denied and now in appeal.
How do we show for compliance for non-occupiable spaces?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Logan Dorrell on
I'm a little confused by what we are supposed to show to document compliance for non-occupiable spaces, like restrooms, that the space matrix call out as "N (VRP) / Y (other req's). We have filled
VAV box serving multiple space types
NC-2009 IEQp1:Minimum IAQ Performanceposted by Mike Fortier on
One of my project's multi-zone systems has a single VAV box serving multiple space types (corridor, storage, office). What is the best way to approach this scenario in the 62MZ calculator?
Blower Door Test for Non-Smoking Hotel: IEQP2: ETS Control
NC-2009 IEQp1:Minimum IAQ Performanceposted by Sasha Peters on
Blower Door Test for Non-Smoking Hotel For a Hotel Project where the Owner has confirmed its policy to be entirely non-smoking, is the requirement to conduct blower door testing (IEQP2: ETS Contro
Exhaust Rates for Enclosed Parking Garages
NC-2009 IEQp1:Minimum IAQ Performanceposted by Diego Pietzsch on
How project teams applying combined a ventilation strategy(Mechanical + Natural) should proceed in order to meet the minimum requirements established in ASHRAE 62.1-2007, Table 6-4, for parking g