Post a question or comment
Credit Filters
Minimum IAQ Performance
Filter by location
Forum
Topic
Replies
Recent

Low System Ventilation Efffiency for Corridors

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Todd Tewksbury  on 

Hi, I am conducting a ventilation calculation for the an office building that consists of open office space, conference rooms, corridors, etc.

1
Mon Jul 27, 2015, 1:16 pm

Combine Natural ventilation & trickle ventilation for Apartment

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Thu Nguyen  on 

Dear all experts! I have a high-rise residential building which aim to comply with IEQ pre.1 by combining 2 ways. 1.

1
Thu Mar 31, 2016, 1:25 pm

High rise residential

posted by  Joseph Blanco  on 
1
Tue Feb 16, 2010, 12:31 am

Local equivalent

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Paula Rantanen  on 

We are planning to use local code to meet the prerequisite. There are a few space types for which the local requirement is less stringent.

1
Fri Jan 20, 2017, 3:26 pm

Naturally Ventilated building - Hot and Humid Zone A1

NC-2009 IEQp1:Minimum IAQ Performance
posted by  LEED Pro Consultant  on 

We are looking to certify a naturally ventilated project NC-v2009 (bus terminal) that is located in a Hot and Humid zone.

1
Fri Feb 21, 2014, 6:21 pm

Mixed Mode Ventilation for Apartment Kitchens

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Neil Sen  on 

We are designing apartments with mixed mode ventilation--the areas within 25 feet of a window will be naturally ventilated and the rest of the dwelling units will be mechanically ventilated.

1
Sun Aug 27, 2017, 10:56 pm

Definition of "Outdoor Air"

NC-2009 IEQp1:Minimum IAQ Performance
posted by  James Chueh  on 

We are seeking LEED NC certification in a high-tech manufacturing plant, and it is a normally practice to only use natural ventilation (louvers and openings to outside of the building) for spaces s

1
Tue Oct 18, 2011, 5:37 pm

EQ p1 -Minimum IAQ Performance (Natural Ventilation)

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Harsharan Kaur  on 

Hello, We are working on a Project, in which most of the rooms are complying with the ASHRAE 62.1-2007 Natural Ventilation requirements, stated under the IEQ Prerequisite 1 – Minimum Indoor Air Qu

1
Mon Jun 30, 2014, 3:29 pm

IEQp1 required signatory

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Anne-Maria Vierinen  on 

Our HVAC designer is also the ventilation systems designer on our project.

1
Thu Feb 9, 2012, 10:53 am

Does mech engineer need to be PE to sign the "signature' box ?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Matt Dem  on 

Shall the person who enters his/her initials under signatory section ( for example IEQp1 or EAp2-1, 2-2, 2-3 ) be registered mechanical engineer (PE) ?

1
Mon Dec 29, 2014, 2:40 pm