Forum quick links
Material reuse based on cost or volume
NC-2009 MRc3:Materials Reuseposted by Mahbuba Khan AIA, LEED AP BD+C on
I am working on an international LEED NC 2009 project.
Salvaged Materials Code Conflict
NC-2009 MRc3:Materials Reuseposted by Annalise Reichert on
I am working on a 17-story multi-family new construction project in California that will not involve any demo of existing structures at the site.
Is soil a material considered on this credit?
NC-2009 MRc3:Materials Reuseposted by Albert Sagrera on
Would you consider the reuse of soil on this credit? The situacion is that the soil extracted for the building construction is not send to dump but it's reused on the modeling of landscape.
Documenting costs and cut sheets
NC-2009 MRc3:Materials Reuseposted by John Covello on
Hello, Our project will be purchasing old teak wood (in good shape) from housing that is to be demolished. The invoices may be simple hand written pages noting the pricing and date.
Material Reuse on Other Buildings within Site Boundary
NC-2009 MRc3:Materials Reuseposted by Josh Sawyer on
We are working on project that has four buildings connected together on the site.
Materials Reuse-Clarification of credit implementation
NC-2009 MRc3:Materials Reuseposted by Elle Brown on
Can some one clarify if I'm understanding the implementation of this credit correctly? If material is salvaged onsite it must be used in a purpose other than for which it was intended (except for
Calculating materials costs to achieve MR credits
NC-2009 MRc3:Materials Reuseposted by Remigio Antonio Rancan on
Hi all, i don't find Table 2 indicated in LEED reference Guide for green BD+C p. 337. Can anyone help me? Thanks a lot.
Material reuse
NC-2009 MRc3:Materials Reuseposted by Ameet AA on
If the materials are to be reused, ship from another country would it assist for attaining any LEED Credits? As i understand it would not be sustainable in terms of carbon emission.
Dismantling of building
NC-2009 MRc3:Materials Reuseposted by Tanja Arnesson on
Hi, We have a site were four different buildings will be conducted. Within the contract from the municipality demolition of two buildings should be carried out before the new construction.
Re-using shale and theater seating
NC-2009 MRc3:Materials Reuseposted by Michelle Meis on
I am on a project that is installing geothermal. The company that will be drilling the wells is planing on re-using the shale that is removed during the process.