Wood reuse
NC-2009 MRc2:Construction Waste Managementposted by Gabriela Crespo on
Dear Forum, We are working on a project where the customer wants to divert wood donating it to people to use in their home furnaces (for cooking and heating).
Can We Use Both Facility and Site Rates?
NC-2009 MRc2:Construction Waste Managementposted by Sara Zoumbaris on
Hi all, I am working on a project that ended up using 2 separate waste haulers during the time of the project - one for the first half or so, and the second for the remainder of the project.
Waste Management
NC-2009 MRc2:Construction Waste Managementposted by Ali Scander on
Hello, I'm concerned about our project earning points for MRc2.
Washout Waste
NC-2009 MRc2:Construction Waste Managementposted by Abena Darden on
I've seen previous discussions as to equipment clean-up water waste not being applicable to this credit, but in our project, water and aggregate is generated by the installation of materials.
Wood waste to be recycled into biomass fuel
NC-2009 MRc2:Construction Waste Managementposted by Noriko Nagazumi on
Hi, Our project emits a certain volume of wood waste, which is used mainly for packaging equipment.
Wrong Diversion Method
NC-2009 MRc2:Construction Waste Managementposted by Chris Anderson on
I have a problem, our construction waste management plan didn't specify Load-specific diversion reports, so all of the reports we have received (5 months) have been facility average rates.
Temporary construction material left on-site.
NC-2009 MRc2:Construction Waste Managementposted by Keith Robertson on
Should MRc2 include temporary construction materials that are left on-site. In particular, it is common for a crane-base, or temporary concrete dead-men or casting beds to be left on-site.
Leed Online Forms
NC-2009 MRc2:Construction Waste Managementposted by kelly saunders on
I'm not clear about using the LEED online forms. Are they supposed to filled in periodically and uploaded into the system or is this done at the end of the project when submitting for credits?
Building Demoliton outside my LEED Boundary
NC-2009 MRc2:Construction Waste Managementposted by Faith Wilbert on
Hello, I'm currently working on a project where we are building a new dormitory. When the new dorm is up and running the existing dorm down the road will be demolished.
Salvaging Furniture
NC-2009 MRc2:Construction Waste Managementposted by Jonathan Weiss on
For a project I am working on, we are demolishing classrooms with built-in furniture.