EAc5, Option #3 = MPR #6
NC-2009 EAc5:Measurement and Verificationposted by Dave Hubka on
Why are project teams awarded a point for following the requirements of a Minimum Program Requirement? I am not complaining, I love free points!...
Measurement and Verification for two building campus (metering)
NC-2009 EAc5:Measurement and Verificationposted by Saju Varghese on
Hello.
Initial energy model required for M&V?
NC-2009 EAc5:Measurement and Verificationposted by Eamon Geary on
I am working on a large campus project. We are planning on obtaining EA 5 for all eight facilities on the campus. However, we are not doing energy models for all eight facilities.
EAc5 Measurement and Verification Option 3
NC-2009 EAc5:Measurement and Verificationposted by Dan Milewski on
Is Option 3 (1 point) - Meet MPR 6 through compliance Opttion 1: Energy and Water Data Release Form. Is option 3 available as a stand alone option or only as a exemplary performance if Options 1
M&V option D. certification timing
NC-2009 EAc5:Measurement and Verificationposted by Alex Parella on
When using Option D, should we wait till the end of the 1 year monitoring to obtain the credit and, therefore, the final building certification?
More option D vs option B
NC-2009 EAc5:Measurement and Verificationposted by Thomas Huang on
Thank you for this very helpful forum. I have read every comment on EAc5 as I prepare to submit our first M&V plan.
Energy Star's energy report
NC-2009 EAc5:Measurement and Verificationposted by Soo young No on
According to EA5 Measure and verification, required 1 year of energy usage report. But in PI from 1: Minimum Program Requirement (PIf1-1), required for duration of five years. Is it under same Ener
Defining the baseline
NC-2009 EAc5:Measurement and Verificationposted by Gustav Alfaro on
Hi to all: Please help me to clarify how the baseline model is defined for the M&V plan, it is clear that for the "actual case" the proposed model created for the EAc1 must be calibrated based
Sub-metering in Option D
NC-2009 EAc5:Measurement and Verificationposted by Alicia Villanueva on
Marcus Sheffer posted some months ago in this credit: "You will need to calibrate the model by energy end use on a monthly (and annual) basis. [...] Yes you would need to separate out the electric
M&V Plan for Residential Project
NC-2009 EAc5:Measurement and Verificationposted by Lauren Fakhoury on
Hi all, I'm working on a residential project where the tenants do NOT pay their utility bills.