EAc5, Option #3 = MPR #6

NC-2009 EAc5:Measurement and Verification
posted by  Dave Hubka  on 

Why are project teams awarded a point for following the requirements of a Minimum Program Requirement? I am not complaining, I love free points!...

3
Wed Apr 23, 2014, 1:35 pm
3
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Wed Apr 2, 2014, 1:44 pm

Initial energy model required for M&V?

NC-2009 EAc5:Measurement and Verification
posted by  Eamon Geary  on 

I am working on a large campus project. We are planning on obtaining EA 5 for all eight facilities on the campus. However, we are not doing energy models for all eight facilities.

3
Energy Efficiency Ninja
Grumman/Butkus Associates
LEEDuser Premium Member
64 thumbs up
Tue Feb 11, 2014, 12:59 am

EAc5 Measurement and Verification Option 3

NC-2009 EAc5:Measurement and Verification
posted by  Dan Milewski  on 

Is Option 3 (1 point) - Meet MPR 6 through compliance Opttion 1: Energy and Water Data Release Form. Is option 3 available as a stand alone option or only as a exemplary performance if Options 1

8
Sustainable Building Consultant
Green Bridge Consulting
LEEDuser Expert
28 thumbs up
Fri Jan 10, 2014, 2:29 pm

M&V option D. certification timing

NC-2009 EAc5:Measurement and Verification
posted by  Alex Parella  on 

When using Option D, should we wait till the end of the 1 year monitoring to obtain the credit and, therefore, the final building certification?

4
Default Avatar
HVAC consultant
Optimized Systems
LEEDuser Basic Member
19 thumbs up
Wed Oct 30, 2013, 10:38 pm

More option D vs option B

NC-2009 EAc5:Measurement and Verification
posted by  Thomas Huang  on 

Thank you for this very helpful forum. I have read every comment on EAc5 as I prepare to submit our first M&V plan.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Oct 2, 2013, 12:38 pm

Energy Star's energy report

NC-2009 EAc5:Measurement and Verification
posted by  Soo young No  on 

According to EA5 Measure and verification, required 1 year of energy usage report. But in PI from 1: Minimum Program Requirement (PIf1-1), required for duration of five years. Is it under same Ener

3
Default Avatar
FCA construction
LEEDuser Basic Member
1 thumbs up
Thu Sep 5, 2013, 2:34 pm

Defining the baseline

NC-2009 EAc5:Measurement and Verification
posted by  Gustav Alfaro  on 

Hi to all: Please help me to clarify how the baseline model is defined for the M&V plan, it is clear that for the "actual case" the proposed model created for the EAc1 must be calibrated based

5
Default Avatar
Mechanical Engineer
LEEDuser Basic Member
10 thumbs up
Fri Jul 5, 2013, 4:56 pm

Sub-metering in Option D

NC-2009 EAc5:Measurement and Verification
posted by  Alicia Villanueva  on 

Marcus Sheffer posted some months ago in this credit: "You will need to calibrate the model by energy end use on a monthly (and annual) basis. [...] Yes you would need to separate out the electric

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon May 6, 2013, 10:57 pm

M&V Plan for Residential Project

NC-2009 EAc5:Measurement and Verification
posted by  Lauren Fakhoury  on 

Hi all, I'm working on a residential project where the tenants do NOT pay their utility bills.

3
Mon Apr 29, 2013, 3:04 pm