Using LEEDv2009 form to insert 'other' refrigerant for LEEDv4 project

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Kavita Suresh  on 

The refrigerant used on my project is not listed in the LEEDv4 form and as recommended on the FAQ section for this credit I am using the LEEDv2009 form to document compliance.

0

Standby Cooling

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Lara Cogill  on 

I am working on a large project for which the cooling is predominantly from central chillers providing chilled water. This complies easily with the requirements of EAc4.

3
Sun Apr 19, 2020, 3:15 pm

Are 30% and 40% PG considered as refrigerant

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Romio Mikhael  on 

Hi all, For a new construction project, the fan coil unit schedule shows that the fluid for the cooling coil is 30% PG (Propylene Glycol) and that of the heating coil as 40% PG.

3
Building Enclosure Consultant
BPL Enclosure
LEEDuser Basic Member
58 thumbs up
Thu Feb 27, 2020, 6:50 pm

Split System - for the refrigerant charge calculation

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Hendrick Munoz  on 

Which part of a Split System should be considered for the refrigerant charge calculation?

1
Wed Feb 27, 2019, 10:10 am

Heat pump with apx 4 kg of refrigerant

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Maria Porter  on 

Hi!

I can see that similar questions have been asked before, but I can’t find any answers:

0

documentation toolkit

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Courtney Royal  on 

i was looking at the uploaded cutsheet under the documentation toolkit, and it doesn't look that piece of equipment is meeting the credit requirements.

1
Thu May 17, 2018, 12:50 am

help understanding how to select equipment

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Courtney Royal  on 

I am having a difficult time understanding how to guide the mechanical designer on specifying compliant equipment.

0

Simultaneous Heating and Cooling

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Andrea Traber  on 

I have a project with an air-source heat pump that can either do heating, cooling or simultaneous heating and cooling. The heat pump has two refrigerant circuits.

2
Fri Mar 23, 2018, 4:30 pm

Calculation of Rc in 4-pipe air-source heat pumps

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Ricardo Sá  on 

I have a project with an air-source heat pump that can either do heating, cooling or simultaneous heating and cooling (4 pipes).

3
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Fri Jan 19, 2018, 6:23 pm

For Campus

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Esteban Martinez  on 

Hello all, we are trying to comply with this credit to certificate a Campus in Colombia.

1
Tue Nov 7, 2017, 10:14 pm