Central PV system distribution to one LEED target building
NC-2009 EAc2:On-Site Renewable Energyposted by Hongyun Zhou on
I am working on a single building LEED project in an industry park, which has a central PV system inside.
Sea water exchanger heat pump, considere as renewable energy ?
NC-2009 EAc2:On-Site Renewable Energyposted by Elodie DUMAS on
Hello We work on an office building connected to DES heating and colling (district level) and pursue Leed C&S v2009 certification.
REC Certificate - Renewable Energy
NC-2009 EAc2:On-Site Renewable Energyposted by SAMY Chamy on
Dear All:- Our project don't have any Renewable energy such as Solar, Windmill so we plan to Buy a REC certificate for our Entire energy use (100%) as per ID -10161 1.Is it possible to get EAc2,
Solar Energy
NC-2009 EAc2:On-Site Renewable Energyposted by SAMY Chamy on
Dear Al:- Our project have 50 kWp Grid connected solar panel system with out battery back up.
Hydrogen Production
NC-2009 EAc2:On-Site Renewable Energyposted by Kristopher Lashley on
Hi, We are looking to install an on-site hydrogen production station that will produce hydrogen that is then sent to hydrogen charging stations around the project to refuel and run a fleet of hdrog
Power generated in Mini Hydro Power Plant
NC-2009 EAc2:On-Site Renewable Energyposted by Keerthi Ratnayake on
Hi, We have a mini hydro power plant project. Can we accommodate the total power generated in the plant towards this credit? Thanks!
Elegible On-Site Energy Systems
NC-2009 EAc2:On-Site Renewable Energyposted by Paula Hernandez on
What is exactly a "Low-impact hydroelectric power systems" and how do we demonstrate that it is low-impact. I suppose that electricity coming from a conventional hydroelectric dam is not elebible f
Pre-existing Campus PV Array - Does commissioning apply?
NC-2009 EAc2:On-Site Renewable Energyposted by Heather DeGrella on
If we are allocating production from a campus PV array, in which the array is already built and outside of our LEED boundary, how do commissioning requirements apply?
Post occupancy installation of photovoltaics as an appeal
NC-2009 EAc2:On-Site Renewable Energyposted by Kris Phillips on
We have a project that may be 1 point short of the next level certification after its Construction Final Review and we have been asked to look at options to add a credit or two as an "appeal" to re
Off-site PV array with PV Developer
NC-2009 EAc2:On-Site Renewable Energyposted by Michael Pulaski on
My university client is about to sign a letter of intent for a Net Metering Credit Purchase Agreement with a PV Developer for a 650 kW array.