Post a question or comment
Credit Filters
On-Site Renewable Energy
Filter by location
Forum
Topic
Replies
Recent

Central PV system distribution to one LEED target building

NC-2009 EAc2:On-Site Renewable Energy
posted by  Hongyun Zhou  on 

I am working on a single building LEED project in an industry park, which has a central PV system inside.

6
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Fri May 6, 2016, 4:27 pm

Sea water exchanger heat pump, considere as renewable energy ?

NC-2009 EAc2:On-Site Renewable Energy
posted by  Elodie DUMAS  on 

Hello We work on an office building connected to DES heating and colling (district level) and pursue Leed C&S v2009 certification.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu May 5, 2016, 3:14 pm

REC Certificate - Renewable Energy

NC-2009 EAc2:On-Site Renewable Energy
posted by  SAMY Chamy  on 

Dear All:- Our project don't have any Renewable energy such as Solar, Windmill so we plan to Buy a REC certificate for our Entire energy use (100%) as per ID -10161 1.Is it possible to get EAc2,

3
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Sun Apr 24, 2016, 11:54 pm

Solar Energy

NC-2009 EAc2:On-Site Renewable Energy
posted by  SAMY Chamy  on 

Dear Al:- Our project have 50 kWp Grid connected solar panel system with out battery back up.

5
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Tue Mar 22, 2016, 3:15 pm

Hydrogen Production

NC-2009 EAc2:On-Site Renewable Energy
posted by  Kristopher Lashley  on 

Hi, We are looking to install an on-site hydrogen production station that will produce hydrogen that is then sent to hydrogen charging stations around the project to refuel and run a fleet of hdrog

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 1, 2016, 4:24 pm

Power generated in Mini Hydro Power Plant

NC-2009 EAc2:On-Site Renewable Energy
posted by  Keerthi Ratnayake  on 

Hi, We have a mini hydro power plant project. Can we accommodate the total power generated in the plant towards this credit? Thanks!

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jun 16, 2015, 6:39 pm

Elegible On-Site Energy Systems

NC-2009 EAc2:On-Site Renewable Energy
posted by  Paula Hernandez  on 

What is exactly a "Low-impact hydroelectric power systems" and how do we demonstrate that it is low-impact. I suppose that electricity coming from a conventional hydroelectric dam is not elebible f

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu May 28, 2015, 8:44 pm

Pre-existing Campus PV Array - Does commissioning apply?

NC-2009 EAc2:On-Site Renewable Energy
posted by  Heather DeGrella  on 

If we are allocating production from a campus PV array, in which the array is already built and outside of our LEED boundary, how do commissioning requirements apply?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 19, 2014, 10:04 pm

Post occupancy installation of photovoltaics as an appeal

NC-2009 EAc2:On-Site Renewable Energy
posted by  Kris Phillips  on 

We have a project that may be 1 point short of the next level certification after its Construction Final Review and we have been asked to look at options to add a credit or two as an "appeal" to re

10
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Thu Aug 28, 2014, 11:36 pm

Off-site PV array with PV Developer

NC-2009 EAc2:On-Site Renewable Energy
posted by  Michael Pulaski  on 

My university client is about to sign a letter of intent for a Net Metering Credit Purchase Agreement with a PV Developer for a 650 kW array.

3
Default Avatar
Tetra Tech
LEEDuser Basic Member
3 thumbs up
Tue Aug 26, 2014, 8:31 pm