Forum quick links
EAc1 ASHRAE 90.1-2007 Energy Simulation Model
NC-2009 EAc1:Optimize Energy Performanceposted by Denise Newbould on
Can someone tell me how difficult this modeling software is to use, and how long would it take an engineer who isn’t already familiar with it to get up to speed?
Virtual vs Scaled CEP modeling for LEED EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Larry Jones on
Hi all, We are modeling a new construction hospital whose cooling loads are met by 3 onsite 1350 ton chillers.
LEED V2 - NC A Building Housing a CHP Plant for a Campus DES
NC-2009 EAc1:Optimize Energy Performanceposted by Melissa Crowe on
I have a CHP project that I cannot seem to fit in any one clearly defined compliance path.
New vs. Existing Building Renovation
NC-2009 EAc1:Optimize Energy Performanceposted by Keith Amann on
What is the threshold or level of renovation performed on a given project to make the jump from existing building to new?
ASHRAE 90.1 2007 Humidification system
NC-2009 EAc1:Optimize Energy Performanceposted by Ricardo Marques on
Hi! In Ashrae 90.1 2007 appendix G, in baseline simulation, what is the system type for humidification? (If the proposed building has humidification) Many thanks Ricardo
Kitchen Hood Exhaust and Make-up Air
NC-2009 EAc1:Optimize Energy Performanceposted by Cory Duggin on
What is the correct way to account for kitchen hood exhaust and the consequential 100% OA makeup energy? This is a commercial kitchen and serving area in a hospital. Thanks in advance.
Fan Power Calculation
NC-2009 EAc1:Optimize Energy Performanceposted by Smart Green on
In base case, how to calculate bhp/cfm value for AHUs if we know flow (in CFM) & cooling capacity (btu/h) details?
ASHRAE 90.1 2007 - Evaporative humidifier/ cooler
NC-2009 EAc1:Optimize Energy Performanceposted by Ricardo Marques on
Dears Sirs, In ASHRAE 90.1 2007 APPENDIX G, in baseline simulation, when I should use evaporative humidifier/cooler? Many Thanks Ricardo
Buildings with Non-Standard Space Temp/Humidity Conditions
NC-2009 EAc1:Optimize Energy Performanceposted by Evelyn Dicks, EI, CxA on
I am working on an archive library that requires 50F and 35% RH indoor space conditions.
Addition to Hospital with Shared HW and CHW Plant
NC-2009 EAc1:Optimize Energy Performanceposted by David Weigel, PE on
I am working on a large (250,000 square-foot) addition to a 250,000 square-foot building, both are mixed-use but primarily hospital.