Forum quick links
VRF systems and outside air modeling
NC-2009 EAc1:Optimize Energy Performanceposted by Robert Sutton on
Has anyone done a VRF system serving various zones using say heat pump VRF units and then providing outside ventilation air from a separate dedicated unit serving the same various zones?
Heat Pipe Simulation for EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Kai Andrade on
How do I simulate a heat pipe in the Baseline case? The proposed case has two split DX AHUs serving 22 & 15 zones respectively.
Meeting EAp2 in Zone 1 without A/C?
NC-2009 EAc1:Optimize Energy Performanceposted by Katrina Morgan on
We are starting design for a residential tower in Zone 1 (Hawaii) that will use natural ventilation and no mechanical air conditioning.
EAP2 Mandatory Requirement
NC-2009 EAc1:Optimize Energy Performanceposted by OSCAR DE LA RED on
Can an almost construted building be certified under LEED C&S, if the envelope building is not able to comply with EAP2,EAc1 ASHRAE 90.1.2007 mandatory requirement (OPTION 2 and 3 are not av
swimming pools - baseline
NC-2009 EAc1:Optimize Energy Performanceposted by Sonia Martini on
Hi The building I'm coping with includes some swimming pools. In the proposed case I've modeled them so that they conform to the project. How should I model them in the baseline case?
Lighting Power Density Calculation
NC-2009 EAc1:Optimize Energy Performanceposted by J Douglas Dietrich on
Should under-cabinet, individually-controlled, task lights be included as part of the ASHRAE building area method lighting power density calculation?
Proposed Building Boiler Plant / Baseline Building System
NC-2009 EAc1:Optimize Energy Performanceposted by Blas Beristain on
Hello, In the proposed building simulation, some of the spaces are not yet defined and therefore are being simulated as office spaces with System 3 - PSZ-AC.
infiltration
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
If I model a building where there is mechanical ventilation, how shall I consider the infiltration (i.e.
Submit EAp2 & EAc1 Design Phase, Add Renewable Energy Later
NC-2009 EAc1:Optimize Energy Performanceposted by Ralph Bicknese on
Our LEED-Schools 2009 project is close to Preliminary Design Submittal. One issue which is still under consideration is the renewable energy system.
Fuel Cell & PV energy
NC-2009 EAc1:Optimize Energy Performanceposted by Gaston Viau on
Hi, our project is a commercial building which will get 100% of the electricity from PVs (20%) and Gas Fuel Cells (80%).