VRF systems and outside air modeling

NC-2009 EAc1:Optimize Energy Performance
posted by  Robert Sutton  on 

Has anyone done a VRF system serving various zones using say heat pump VRF units and then providing outside ventilation air from a separate dedicated unit serving the same various zones?

19
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Mar 7, 2013, 3:02 pm

Heat Pipe Simulation for EAc1

NC-2009 EAc1:Optimize Energy Performance
posted by  Kai Andrade  on 

How do I simulate a heat pipe in the Baseline case? The proposed case has two split DX AHUs serving 22 & 15 zones respectively.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Mar 6, 2013, 8:12 pm

Meeting EAp2 in Zone 1 without A/C?

NC-2009 EAc1:Optimize Energy Performance
posted by  Katrina Morgan  on 

We are starting design for a residential tower in Zone 1 (Hawaii) that will use natural ventilation and no mechanical air conditioning.

4
Default Avatar
Principal
Fermata Consulting, LLC
LEEDuser Basic Member
0 thumbs up
Wed Mar 6, 2013, 5:35 pm

EAP2 Mandatory Requirement

NC-2009 EAc1:Optimize Energy Performance
posted by  OSCAR DE LA RED  on 

Can an almost construted building be certified under LEED C&S, if the envelope building is not able to comply with EAP2,EAc1 ASHRAE 90.1.2007 mandatory requirement (OPTION 2 and 3 are not av

6
Mon Mar 4, 2013, 4:08 pm

swimming pools - baseline

NC-2009 EAc1:Optimize Energy Performance
posted by  Sonia Martini  on 

Hi The building I'm coping with includes some swimming pools. In the proposed case I've modeled them so that they conform to the project. How should I model them in the baseline case?

3
Thu Jan 31, 2013, 2:18 pm

Lighting Power Density Calculation

NC-2009 EAc1:Optimize Energy Performance
posted by  J Douglas Dietrich  on 

Should under-cabinet, individually-controlled, task lights be included as part of the ASHRAE building area method lighting power density calculation?

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jan 30, 2013, 7:32 pm

Proposed Building Boiler Plant / Baseline Building System

NC-2009 EAc1:Optimize Energy Performance
posted by  Blas Beristain  on 

Hello, In the proposed building simulation, some of the spaces are not yet defined and therefore are being simulated as office spaces with System 3 - PSZ-AC.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jan 11, 2013, 5:09 pm

infiltration

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

If I model a building where there is mechanical ventilation, how shall I consider the infiltration (i.e.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jan 10, 2013, 4:09 pm

Submit EAp2 & EAc1 Design Phase, Add Renewable Energy Later

NC-2009 EAc1:Optimize Energy Performance
posted by  Ralph Bicknese  on 

Our LEED-Schools 2009 project is close to Preliminary Design Submittal. One issue which is still under consideration is the renewable energy system.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jan 9, 2013, 11:57 pm

Fuel Cell & PV energy

NC-2009 EAc1:Optimize Energy Performance
posted by  Gaston Viau  on 

Hi, our project is a commercial building which will get 100% of the electricity from PVs (20%) and Gas Fuel Cells (80%).

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Dec 27, 2012, 7:05 pm