Forum quick links
percentage of vertical fenestration
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
I have a doubt concerning the percentage of vertical fenestration I have to consider for Table G3.1 5.c. Let me give you an example.
Soladigm Glass
NC-2009 EAc1:Optimize Energy Performanceposted by Tammy George on
We have a project where we are using Soladigm Dynamic Glass which automatically tints the window based on how sunny it is using photosensors on each face of the building.
Base Building for a mixed use project
NC-2009 EAc1:Optimize Energy Performanceposted by Graciela Carrillo on
We have a project that is a mix-used 23,000 SF bldg. The lower story is commercial (8,000 SF) and 2-stories of residential (15,000 SF).
DES Option 2 when project contains the DES
NC-2009 EAc1:Optimize Energy Performanceposted by Stephanie Graham on
Project is LEED-NC v2009 project in which a building contains a DES that serves the project building as well as a larger adjacent building.
LEED 2009 NC - Warehousemodelling HVAC syetm in IES
NC-2009 EAc1:Optimize Energy Performanceposted by Alice chen on
Hi All, I do need help in the energy modelling for a warehouse project. Thanks in advance! This project consists of 200,000sf of warehouse with 5,000sf office space.
Existing Building Baseline Inquiry
NC-2009 EAc1:Optimize Energy Performanceposted by Scott Glancy on
The project consists of upgrading a liquid helium (LHe) to gaseous helium (GHe) conversion and compression system.
Base model minimum efficiencies
NC-2009 EAc1:Optimize Energy Performanceposted by Ming Feng on
Hi, I have a question about baseline building HVAC minimum efficiency.
charging columns
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
In the courtyard of the building that I’m modelling two charging columns for electric vehicles are going to be installed. Shall I consider them as process energy?
Conference room
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
I’m modelling a school in which a conference room is going to be placed. The baseline shall be System 5 - Packaged VAV with reheat.