LEED --NC 2009 Summitals platmatel EA credit 1
NC-2009 EAc1:Optimize energy performanceposted by Yu Tang [email protected] on
Hello,Anyone : Who can help me where can find LEED --NC 2009 Summitals platmatel EA credit 1 Thanks and best regards, Y.T.
Choosing Baseline HVAC-System in climate zone 1b
NC-2009 EAc1:Optimize energy performanceposted by Johannes Hopf on
Hi, 90.1-2007 confuses me a little. Our project (4 story, 9000 m²/90000 ft²) is located in climate zone 1b. The proposed building is heated by an electrical heatpump.
Theater lighting
NC-2009 EAc1:Optimize energy performanceposted by Keelan Kaiser on
I've gone through the threads and can't find a response for a question like this, there must be one, but we have a theater project with all of the speciality lighting associated with this use.
EAc1-Overshadowing(LEED v2.2)
NC-2009 EAc1:Optimize energy performanceposted by gwenedd murray on
ASHRAE's table G3.1, section 5(a), states the baseline model should not shade itself.
ASHRAE 90.1 appendix G - VAV modelisation in baseline system 7
NC-2009 EAc1:Optimize energy performanceposted by Julien Daclin on
Hi, I have a question about the interpretation of section G3.1.3.13 (VAV minimum flow setpoints).
Kitchen Hoods with gas make-up air unit
NC-2009 EAc1:Optimize energy performanceposted by James Sullivan Jr. on
I've been trying to understand how does LEED treat kitchen exhaust hoods with make up unit(heating only) in the energy model. Is it process or non-process?
Natural Ventilation - modeling air conditioned as baseline?
NC-2009 EAc1:Optimize energy performanceposted by Eric Longfellow on
“We are working on an existing classroom and office building at the University of Hawaii, which will undergo a complete remodeling under LEED-NC v.3.0.
Conditioned vs. unconditioned & natural ventilation
NC-2009 EAc1:Optimize energy performanceposted by SmithGroup BG+LU FW on
Table G3.1 in Appendix G requires only conditioned space be simulated as being both heated and cooled in the proposed design.