Forum quick links
Capturing heat recapture for absorption dhillers
NC-2009 EAc1:Optimize energy performanceposted by Vanessa Seibert on
We are working on a college campus that will have a new central plant. We have a onsite micro turbine generators that provide power to the site.
2 point minimum requirement
NC-2009 EAc1:Optimize energy performanceposted by Mike Stopka on
I just wanted to verify that "Two (2) points mandatory for all LEED for New Construction projects registered after June 26, 2007" rule is no longer in effect. Referring to this: http://www.usgbc.o
All-electric buildings
NC-2009 EAc1:Optimize energy performanceposted by Francesco Passerini on
A note of Table G3.1.1A of ASHRAE 90.1-2007 states that "For all-electric buildings, the heating shall be electric resistance".
EAC1 - Day Lighting & Other Lighitng controls input
NC-2009 EAc1:Optimize energy performanceposted by susan eguia on
Hi, We've only done the mechanical portion for this project but the client assigned to us the EAc1 credits.
Baseline Building Rotation
NC-2009 EAc1:Optimize energy performanceposted by Mark Zoeteman on
Would a Baseline Building model need to be average of 90, 180, and 270 degree rotations if Proposed Building model consists of new addition at an existing building?
Proposed case cooling capacity reducing energy savings
NC-2009 EAc1:Optimize energy performanceposted by SSN Energy Model on
Hi, I am doing energy simulation for G+4 Labor Accommodation building. In base case, i have considered 2.66 COP.
ABSL-3 Baseline vs. Proposed Fan Energy for RTU
NC-2009 EAc1:Optimize energy performanceposted by Michael O'Brien on
I've recently come across a deblitating problem as it pertains to the energy modeling of an ABSL-3 space.
DES Option 1 or Option 2
NC-2009 EAc1:Optimize energy performanceposted by Katherine Ann Resurreccion on
If DES will serve multiple buildings "A","B","C" & "D". Buildings "A" and "B" are xisting but only "C" and "D" are candidates for LEED-NC certification.
Existing Envelope for LEED v3
NC-2009 EAc1:Optimize energy performanceposted by Ken Pilcher on
Any help regarding the reuse of an existing building LEED simulation would be helpful. We are working on an existing building that was a warehouse and is now an office building.