Post a question or comment
Credit Filters
Minimum Energy Performance
Filter by location
Forum
Topic
Replies
Recent

process load

NC-2009 EAp2:Minimum Energy Performance
posted by  Florian Schmidtchen  on 

We have currently a LEED NC project of an office building with a data center in the basement.

2
Thu Apr 23, 2015, 12:58 pm

Infiltration rates in LEED Energy Modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Arub Vijay  on 

I am currently doing energy modeling for a LEED Hotel project in Oman. Should I consider the ASHRAE recommended Infiltration rates in all spaces?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Apr 22, 2015, 1:39 pm

Hi all,

NC-2009 EAp2:Minimum Energy Performance
posted by  Visu Boj  on 

I am working on a certification for a factory having less than 5 percent conditioned area. My process load is also high upto 75 percent.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Apr 17, 2015, 5:03 am

ASHRAE standard

NC-2009 EAp2:Minimum Energy Performance
posted by  Nelina Loiselle  on 

Hello, Can someone let me know if ASHRAE 90.1 2010 is acceptable to use in relation to lighting or is 90.1 - 2007 still required to be used?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Apr 15, 2015, 6:46 pm

Baseline System Type for Hotels

NC-2009 EAp2:Minimum Energy Performance
posted by  Sandra Holmström  on 

Hi, I am wondering what Baseline System Type should be used for hotels?

3
Default Avatar
environmental consultant
Bengt Dahlgren AB
LEEDuser Basic Member
1 thumbs up
Wed Apr 15, 2015, 2:59 pm

Typo in DES v2?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

To calculate the virtual rate, DES v2 option 1 2.4.2.1 gives the equation of $/MBTU of hot water = 1.59*$/MBTU fuel + 3 * $/kWh electricity. This would gives me a really big number.

3
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Tue Apr 14, 2015, 5:53 pm

Transitional Entry Atrium Lobby belong in Energy Model?

NC-2009 EAp2:Minimum Energy Performance
posted by  Joyce Kelly  on 

A five story Atrium is being constructed in a science building. It is also the main entry into the building and furnished with benches for transient use.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Apr 14, 2015, 4:55 am

Partial Purchased Energy

NC-2009 EAp2:Minimum Energy Performance
posted by  Christopher Strunk  on 

Good afternoon. I'm getting started on a model for a county courthouse office expansion. In its pre-renovated state, the facility purchases both HW and CW through the local utility.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Apr 9, 2015, 5:51 pm

Energy Modeling In a High bay Industrial area + Office

NC-2009 EAp2:Minimum Energy Performance
posted by  Marcelo Maciel de Santa Helena  on 

What’s the best way to proceed with the energy model of the following case? The building is a 4000m² manufacturing building where there is a small office area and a large high bay industrial area.

7
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Apr 9, 2015, 2:11 pm

Building Facade lighting - ASHRAE Baseline values

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear All, I'm looking at Table 9.4.5 of ASHRAE 90.1-2007 which lists the maximum allowable LPDs for building exteriors.

5
Co-founder
Mimta EcoYapi
LEEDuser Basic Member
133 thumbs up
Wed Apr 8, 2015, 1:47 pm