process load
NC-2009 EAp2:Minimum Energy Performanceposted by Florian Schmidtchen on
We have currently a LEED NC project of an office building with a data center in the basement.
Infiltration rates in LEED Energy Modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Arub Vijay on
I am currently doing energy modeling for a LEED Hotel project in Oman. Should I consider the ASHRAE recommended Infiltration rates in all spaces?
Hi all,
NC-2009 EAp2:Minimum Energy Performanceposted by Visu Boj on
I am working on a certification for a factory having less than 5 percent conditioned area. My process load is also high upto 75 percent.
ASHRAE standard
NC-2009 EAp2:Minimum Energy Performanceposted by Nelina Loiselle on
Hello, Can someone let me know if ASHRAE 90.1 2010 is acceptable to use in relation to lighting or is 90.1 - 2007 still required to be used?
Baseline System Type for Hotels
NC-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
Hi, I am wondering what Baseline System Type should be used for hotels?
Typo in DES v2?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
To calculate the virtual rate, DES v2 option 1 2.4.2.1 gives the equation of $/MBTU of hot water = 1.59*$/MBTU fuel + 3 * $/kWh electricity. This would gives me a really big number.
Transitional Entry Atrium Lobby belong in Energy Model?
NC-2009 EAp2:Minimum Energy Performanceposted by Joyce Kelly on
A five story Atrium is being constructed in a science building. It is also the main entry into the building and furnished with benches for transient use.
Partial Purchased Energy
NC-2009 EAp2:Minimum Energy Performanceposted by Christopher Strunk on
Good afternoon. I'm getting started on a model for a county courthouse office expansion. In its pre-renovated state, the facility purchases both HW and CW through the local utility.
Energy Modeling In a High bay Industrial area + Office
NC-2009 EAp2:Minimum Energy Performanceposted by Marcelo Maciel de Santa Helena on
What’s the best way to proceed with the energy model of the following case? The building is a 4000m² manufacturing building where there is a small office area and a large high bay industrial area.
Building Facade lighting - ASHRAE Baseline values
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear All, I'm looking at Table 9.4.5 of ASHRAE 90.1-2007 which lists the maximum allowable LPDs for building exteriors.