NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Hi Markus, I'd like to ask you for your opinion and advice about applying these values following the case described below. In LEED glossary such spaces are determined as 25 people per 100 sq ft. W
Renewable Energy entered separately in leedonline form?
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Hello, The thermal modeller scope is limited to detailed design, and at this stage Renewable energy (PV and Solar Water Heating) is still not 100% finalized / decided.
Cooling only space and system type 2
NC-2009 EAp2:Minimum Energy Performanceposted by Laura Brandt on
I have a dormitory project which has a few cooling only spaces.
EnergyPro for Whole Building Energy Simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Logan Dorrell on
We have a project in which they are attempting to use EnergyPro to show compliance for credits EAp2 and EAc1.
How to document a non-LEED-certifiable building?
NC-2009 EAp2:Minimum Energy Performanceposted by Anya Fiechtl on
Our project includes a separate non-LEED certifiable building with no regularly occupied space and no FTE, that houses the renewable energy and ground source heat pump systems for the main building
"incomplete spaces" treatment in LEED NC
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
1) An office building that is being certified under LEED NC will have 20% of its gross floor area without a complete interior fit-out at time of construction work completion.
Existing and New Construction
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have a building that contains both existing and new construction. I wonder how we should determine the LEED points we will achieve given certain percentage savings.
Title 24
NC-2009 EAp2:Minimum Energy Performanceposted by Gaston Viau on
Hi there My building has full T24 certification. I take it this will be satisfactory to achieve this Prereq? Thanks
Existing Central Plant and New building
NC-2009 EAp2:Minimum Energy Performanceposted by Mital Patel on
We have a new building that is served by the existing central plant.