Forum quick links
Appendix G-Baseline HVAC System
NC-2009 EAp2:Minimum Energy Performanceposted by Kristin Heinz on
Our project is a bed-and-breakfast with guest rooms that are conditioned using PTHP units. A VRF system conditions the common areas with a DOAS that uses a chiller and hot water boiler.
Baseline HVAC Selection
NC-2009 EAp2:Minimum Energy Performanceposted by April Rice on
We have a 5 story non-residential building (located on a campus), with a mechanical penthouse (with roof) above.
Baseline System 9 fan details
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, We have zones in our project which are addressed to system 9 (heating only).
Part Residence and Part Office
NC-2009 EAp2:Minimum Energy Performanceposted by April Ambrose on
I have a small facility (20k sqft or so) that is approximately 45% office and 55% "transitional" residential. I've modeled it as a residential with PTAC w/ HW Coil per zone, but I'm running into a
Baseline Energy Rates for CHP
NC-2009 EAp2:Minimum Energy Performanceposted by Gopinath Vasu on
I am working on a project where natural gas generator is used power generation and the waste heat is recovered to run the VAM chiller.
MODEL PROTOCOL
NC-2009 EAp2:Minimum Energy Performanceposted by RICARDO GUEMEZ on
Hello, My name is Ricardo from Mexico City.
Fossil fuel furnace
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
According to system 3 of Table G3.1.1A I have to model a fossil fuel furnace for a baseline model. What efficiency shall I consider? "Warm air unit heater, gas-fired" in Table 6.8.1E, i.e. 80%?
Baseline HVAC DCV Sequence
NC-2009 EAp2:Minimum Energy Performanceposted by Cory Duggin on
When the baseline system is required to have DCV, how should it be controlled. I'm not aware of any sections that details how the controls should work when it is implemented for the baseline.