40% WWR does it include the wall connected to other building?
NC-2009 EAp2:Minimum energy performanceposted by Haojie Wang on
90.1 only says above grade wall, but if we have a wall that's directed connected to another building, should we also include those wall area in the calculation?
Continuous insulation definition
NC-2009 EAp2:Minimum energy performanceposted by John Covello on
Hello, We have a project where our resort rooms will be using spray foam insulation above a concrete slab, set in zone 1. Our rooms are actually small villas.
Any HAP Expert?
NC-2009 EAp2:Minimum energy performanceposted by Khaled Fouda on
I use Carrier-HAP and according to ASHRAE 90.1 G.1 #4, all baseline HVAC fans should be running continuously when the space is occupied and cycled when the space is unoccupied.
Changes during Design Review
NC-2009 EAp2:Minimum energy performanceposted by Victoria Watson on
Hi, We are currently responding to LEED Reviewer comments for a building.
Treatment of District or Campus Thermal Energy and EAp2-7 tables
NC-2009 EAp2:Minimum energy performanceposted by AAME User on
Our project involves the new construction of a healthcare clinic that is being heated and cooled via heating and chilled water produced by a campus central plant.
Natural Ventilation modeling question
NC-2009 EAp2:Minimum energy performanceposted by Billy Condor on
Hello! An educational building will have no AA for its classroom, workshops and labs (mainly 90% of the project area), as all these areas will be naturally ventilated (complying with section 5.1 o
Fan power and HVAC efficiency of Baseline Model
NC-2009 EAp2:Minimum energy performanceposted by Jatuwat Varodompun on
Is it true that the HVAC baseline efficiency in Table 5.8.x is the total HVAC efficiency including fan? I.E.
"Conditioned Space?" - Free cooling with outside air
NC-2009 EAp2:Minimum energy performanceposted by Victoria Watson on
Hi, I am not sure whether to class mechanical rooms which are free cooled by outside air as "conditioned" for the purpose of the baseline (so the baseline would be on system 5 in this example).
Modeling District Steam in Baseline
NC-2009 EAp2:Minimum energy performanceposted by Nicholas Young on
We are looking at an existing 300,000 s.f. hotel highrise in a downtown location that is currently on a citywide district steam utility.