Post a question or comment
Credit Filters
Minimum Energy Performance
Filter by location
Forum
Topic
Replies
Recent

How to model the ventilation system for baseline model.

NC-2009 EAp2:Minimum Energy Performance
posted by  La Verne Ramir Certeza  on 

Hello, I would just like to ask regarding how I should model the ventilation system of my baseline model. My project is a hotel building which uses chilled water as its main cooling medium.

1
Wed Dec 5, 2012, 10:43 pm

Using Desiccant Dehumidification - What about the Baseline?

NC-2009 EAp2:Minimum Energy Performance
posted by  Mark Benson  on 

In some cases, such as Hospital operating rooms and Ice Rinks, you have to maintain indoor air dewpoint temperaturs lower than 44 F.

1
Tue Apr 8, 2014, 4:37 pm
1
Thu Aug 12, 2010, 10:06 pm

Energy Modeling for Design Sumittal

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear All:- we plan to submit a project in Design stage so please advise how to do energy model in design model what are the major changes in energy model between Design and Construction submission

1
Tue Aug 2, 2016, 3:14 pm

HAP boiler input data

NC-2009 EAp2:Minimum Energy Performance
posted by  PAWAN DAHIWAL  on 

is estimated max load reported in HAP boiler input data for baseline case same to that of total heating capacity reported in Table 1.4 HVAC (water side) for baseline???. In one of the project Est

1
Fri Jan 11, 2013, 4:18 pm

Heat recovery and dehumidification

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

In a swimming pool removing latent heat is necessary all the year round. For the baseline model, if I model the heat recovery according to G3.1.2.10 Exhaust Air Energy Recovery (50% both sensible a

1
Tue Aug 8, 2017, 1:53 pm

Diesel generator for peak shaving

NC-2009 EAp2:Minimum Energy Performance
posted by  Luana Bertoletti  on 

Hi, I'm involved in a project which will regularly use a diesel generator for peak shaving. May I use this strategy ir order to verify compliance with EA.p2 and take credit in EA.C1?

1
Fri Aug 30, 2013, 3:43 pm

Task light process load or lighting load?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

I saw some people say task light is process load but sometimes it can be count into lighting power. I wonder is there a good way to treat task light?

1
Fri Feb 27, 2015, 6:16 am

LPD part of mandatory provisions?

NC-2009 EAp2:Minimum Energy Performance
posted by  Tatjana Ernst  on 

Hi everyone, i am wondering if the interior lighting power is also restricted by LEED. Do we have to show compliance with the table 9.5.1 or 9.6.1 in ASHRAE?

1
Wed Jan 26, 2011, 12:04 pm

Modeling KFC

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Hi Marcus and colleagues, The project we have to model is a KFC fast food complex, having GFA of 300 m2 single floor. In accordance to App.

1
Fri Dec 11, 2015, 12:00 am