Forum quick links
Clarification on minimum energy savings and EA credit 1
NC-2009 EAp2:Minimum Energy Performanceposted by Joanne Haye on
I have a Client that is considering LEED certification, we have done a preliminary energy model, we show a 24% savings off the baseline.
100% outdoor air indirect evaporative cooling system
NC-2009 EAp2:Minimum Energy Performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.
EnergyPro printout vs EAp2-Section 1.4 Tables
NC-2009 EAp2:Minimum Energy Performanceposted by Robert Robison on
Is it really necessary to fill out the EAp2-Section 1.4 Tables spreadsheet when it looks to me like EnergyPro provides all the same data in the exact same format?
process load categorization
NC-2009 EAp2:Minimum Energy Performanceposted by Ramana Koti on
Greetings. This is more of a LEED for Retail question pertaining to modeling a commercial kitchen.
SHGC Value ASHRAE 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by John Covello on
Hello everyone, Are the maximum SHGC values in ASHRAE 90.1-2007 suggested only? For example on table 5.5-1 there is a max SHGC listed of 0.25.
Energy Savings - Solar Water Heating
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi! when i have a solar water heating system, must submit like energy savings? Thanks
why do we need to model heating if we have none
NC-2009 EAp2:Minimum Energy Performanceposted by Alicia Villanueva on
I am working in projects in Mexico and it has been a challenge to model heating when we have none. Sometime when modeling heating comes out higher in the proposed design than in the baseline and t
Baseline system selection
NC-2009 EAp2:Minimum Energy Performanceposted by Jane Long on
I'm modelling a European Industrial project where nearly a 5th of the floor area is a specialist process area, similar to a clean room or laboratory, however used for industrial processes, in use 2
Modeling HVAC for future un-designed office space
NC-2009 EAp2:Minimum Energy Performanceposted by Vernon Smith on
I am modeling a 50,000 sf college cafeteria that has a basement, a main floor and a mezzanine. A portion of the basement is part of the cafeteria.
Regional industrial practices
NC-2009 EAp2:Minimum Energy Performanceposted by Valentin Grimaud on
Dear community, I am facing a problem meeting the eap2 credit since my project presents almost 80% energy cost related to process.