Baseline Envelope NonResi/Resi U-Values
NC-2009 EAp2:Minimum Energy Performanceposted by Emir Pekdemir on
Our project is a multi-family residential project (8 stories) and we have modeled the baseline roof as a Residential, Insulation Above Deck U-Value per Table 5.5-1. We have received a LEED Review
Modeling a commercial kitchen
NC-2009 EAp2:Minimum Energy Performanceposted by September Silvers on
I am trying to model a commercial kitchen. I read through previous threads and found some helpful information on including fan power for this type of space.
Ventilation (G3.1.2.6)
NC-2009 EAp2:Minimum Energy Performanceposted by Curtis Clark on
A proposed building is designed which the minimum flow rate on the VAV box is the minimum outside air ventilation rate.
Slab on Grade F-factor for a large building
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
I asked this a couple of days ago on the HAP users forum and no one has responded so hopefully I'll have better luck here.
Existing areas with lighting to remain as is
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
We are doing a project that is a renovation and addition. Renovation of existing HVAC and addition of a gym as part of the same building (This area requires new MEP).
thermal blocks for open plan offices
NC-2009 EAp2:Minimum Energy Performanceposted by Rosana Correa on
I am modeling an office building which has 2 open-plan offices facing 3 different orientation each.
Energy Star
NC-2009 EAp2:Minimum Energy Performanceposted by Robert Sutton on
If my buiding type is not in Energy Star and I don't see it really in the 2003 CBECS PerformanceTargetsTable and I try to use what I think is closest.
Vestibules for retail shops less 300 m2 - NR
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
I'd like to use 5.4.3.4 Exception g to exclude the need for vestibules for each shop entrance of the shops that our office building has on the street level.
Better to include PV in the ASHRAE model or calc outside?
NC-2009 EAp2:Minimum Energy Performanceposted by Carol Roberts on
We are working on an ASHRAE 90.1 model in Nevada and are adding the solar information manually to the LEED online forms, post energy modeling (so our solar energy is not appearing on the software g
District Energy System (DES) based on CHP plant
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
A building that is being certificate under LEED 2009 will be built in a campus with a dedicated District Energy System (DES) based on a combined heat and power plant (CHP).